Loading...
CF-TownC CHC-CS 890303MEMORANDUM TO: Alan D. Ratliff, City Manager FROM: RussellR. D D~ P.E., City Engineer RE: PARKWAY BOU~ARD IN FRONT OF TOWN CENTER 16 INCH WATER MAIN PLACEMENT/TRAFFIC DETOUR It came to our attention yesterday, (and there was a Staff coordinating meeting today), that the Contractor for the 24" Crosstown Water Main Project will be placing the 16 inch water main along the north side of Parkway Boulevard. In order to do this in the most efficient and safe manner possible, the Contractor will keep both directions of traffic on the south side of the pavement. During this detour, the west bound traffic will not cross over to the north side pavement, from the existing cross over to Denton Tap Road. Given good weather conditions, etc., this traffic switch-over should only be for two (2) days, Monday and Tuesday, March 6th and 7th. The project will be barricaded using standard acceptable traffic control measures. RRD/lsg xc: Frank Trando, Deputy City Manager/Finance Director Wayne Ginn, P.E., Ginn, Inc. PRKWY FORWARDED TO MAYOR ANJ0 GOUNCIL