Loading...
CF-TownC CHC-CS 881110 i11111 ! _ TO: Tom Center Employees . . ~ FRO~, David ParrT, Purchasin~ ~o~,~ RE~ Paintin~ of Coppell gown Centor A request for proposal is being mailed today for the painting of selected areas of Coppell Town Center. Attached is a copy ~ of the areas proposed. A decision will be made after the bid //~ opens to determine which areas or if all areas will be painted. The decision will be made on the basis of available funds. A mandatory meeting is scheduled for 9:00 AM, Monday, November 28, 1988 for prospective bidders to view the building and to clarify the areas for proposed painting. SECTION I - EXTERIOR TRIM Outside trim including the perimeter trim on the roof line, metal entry doors and casings, and the "X# designs on the exterior of the building. Total Section I including all labor and materials SECTION II - ENTRY AREA, LOBBY AREA, COUNCIL CHAMBERS Entry walls and doors, inside facing of the entry windows, columns by stairs on first floor, window area and walls by Utility Billing Department, hallway to restrooms and Coke machine, walls in women's restroom, City Council Chamber walls, Lobby area walls by elevator, Police Depart- ment and walls to the Court Department. Total Section II including all labor and materials SECTION III - POLICE DEPARTMENT All walls and selected trim in the following: Report Room, Criminal Investigations, Entry area including double entry doors into the Police Department, Environmental Health and clerical area, Chief's office, Sargeant's office, Lieutenant's office, Interrogation Room, hallway and inside of entry door, both jail cells and selected doors, Animal Control office area/records room including inside of windows and related trim, Dispatch area including bathroom. Total Section III including labor and materials SECTION IV - COURT/PURCHASING/PERSONNEL All walls, front entry door and window area with related triminside the Court Department. Proposed walls/trim for the Purchasing Department and the Personnel Department. Total Section IV including all labor and materials SECTION V - KITCHEN AREA, HALLWAY, FINANCE, UTILITY BILLING, TAX COLLECITONS AND COMMON AREAS All walls in the following: kitchen conference area, kitchen sink ara, Accountant's office, Assistant Finance Director's office, Tax Assessor's/Utility Billing Co- ordinator's office, finance/tax/utility billing common area and hallway from computer room to common area. Total Section V including all labor and materials SECTION VI - SECOND FLOOR SELECTED AREAS Columns at top of stairway, elevator entry area including elevator doors and entry trim, hallway to restrooms, entry doors to administrative area and Library, two gray columns in Library, Engineering clerical area and Engineer's office. Total Section VI including labor and materials Grand Total of all sections $