CF-TownC CHC-CS 881010 P.O. ~x 478 ~p~ll, ~ 75019 The City With A Beautiful Future 214-~2-0~. , Martha Col~an l t Strasburger & Price 4300 Interfirst Plaza 901 Main Street Dallas, Teas 75250 Dear There have ~en several re~ests for escrowing the money for the building of the To~ Center in Cop~ll. With the accosting syst~ that the City of Cop~ll curr~tly has, it is easy to identify how much interest is earned off of this money ~cause it is in a serrate accost. Also, ~cause of the investm~ts syst~ that the City uses we are ~le to earn a ~tter rate of interest on the small ~o~t of money that is in this f~d. We cosine the ~o~t in this f~d with larger sas of money to get a ~tter interest rate. It is not the City's intention to wit~old f~ds from anyone, but, at the s~e time, we must protect the City's interest. T~refore, it is the City's inter to retain this money in a serrate accost and in the ev~t that we cannot come to a mutual agre~ent in clearing up these last few it.s on the To~ Center we will ~ ~le to s~nd these f~ds to have th~ corrected. Sincerely, Fr~k Tr~do Deputy City Manager/Fin~ce Director FT/lr cc: Alan D. Ratliff, City Manager Dale Jackson, Chief Building Official Larry Jackson, City Attorney FORWARDED TO MAYOR AND COL CiL. DATE Coppell, Texas 75019 The City Witt~ A Be;utiful' Future 214-462-0022 October 4, 1988 Martha Coleman Strasburger & Price 4300 Interfirst Plaza 901 Main Street Dallas, Texas 75250 Dear Ms. Coleman: Attached are the documents we spoke of last week. The documents should clear up question concerning who is financially responsible for the fees for the roofing consultant and the roof repairs that are needed at the Coppell Town Center building. The attached letter to Larry Lieneke outlines the agreements that were reached between the City of Coppell, Howard U. Freeman and Cigna Property and Casualty. One of the items agreed upon was that an independent roofing consultant would review the existing roof work an the approved roof plans to determine if the roof leaks were caused by bad design or improper installation. If the roof leaks were caused because of a bad roof design, the City of Coppell agreed to pay for the consultants fee; however, if the consultant determined that the leaks were caused by improper installation of the roof, the consultants fee would be paid for by Howard U. Freeman. The report from the roofing consultant, Roof Engineering Inc. (R.E.I.), lists several instances where the existing roof installation does not comply with the approved architectural plans and specifications. R.E.I. has determined that the Town Center roof leaks have occurred because the contractor deviated from the approved roof plans. Howard U. Freeman has contended that the differences in the existing work were changes approved by the architect; however, Freeman has not provided any documentation that shows the changes were actually approved by the architect. The bill for the consulting services rendered by R.E.I. was sent to Howard U. Freeman in January; however, the bill has never been paid. Since this is a debt that should be paid by Freeman, the City of Coppell is requesting that Cigna Property and Casualty allow the bill to be paid and deducted from the contract retainage money that is still held by the City of Coppell. Martha Coleman October 4, 1988 Page 2 As you have requested, we obtained a written price estimate from a roofing contractor for the roof repair work that is needed at the Town Center building. The contractor's estimate for the work that is needed is $9125.00. The estimate from R.E.I. for consultation work with the roofing contractor is $600.00. As you are aware, the roof leaks are beginning to cause damage to the interior of the building. Interior building damage has not been figured into the above estimates. If repair work is not initiated soon, interior building damage will also need to be assessed. If you have any questions, I can be reached at 462-9010. Thank you for your help in resolving thfs problem. Sincerely, Dale Jackson Building official cc: Alan D. Ratliff, City Manager Frank Trando, Deputy City Manager/Finance Director roof engineeHn inc. plaza at r~e~end I 1221 ~verbend dr., suite 252 dallas, ~xas 75247 214-634-7192 September 22, 1988 Hr.Dale Jackson City of Coppe11 Coppell Town Center P. O. Box 478 Coppe11, Texas 75019 RE: Coppell Town Center Coppell, Texas ' Dear Hr. Jackson: As per your instructions, Roof Enginering Inc. has coordinated with a roofing contractor, ~eatherguard 1nc. of Dallas, Texas, to work up a price on the repair of the problems to the Coppell City Hall as noted in Roof Engineering's letter dated FebrUary 3, 1988. Weatherguard's proposal is to rework detailing at the Juncture of the flat roof areas, the tile at the termination of the tile around the perimeter edge, and'flashings on the low roof areas in the northwest and southwest corners of the building. Enclosed is a copy of a telephone report on their proposal to do the work as described for $9,125.00. Please note Weatherguard Inc. is offering a one year guarantee for their repairs. If. you find this proposal acceptable, please call Neatherguard~ Inc. directly at 21~-2~1-8501 and send a purchase order directly to ~eatherguard, Inc., 11126 Shady Trail, Suite 108, Dallas, Texas 75229. If you have any questions, please feel free to call. Sin~rely, ~James O. Wharry Vice President JO~:df Enclosure cc: Hr. Jim D. Koontz, REI NOTES FROM TELEPHONE CONVERSATION 1/1/1/1/////////////////////////////////////////////H/////////// CONVERSATION WITH: ~,~' ~' ! COMPANY: ~.~'~-,wt ~ (-~ ,.,,4,~,) ~C. ~ qt- ~-~ t PROJECT: ~or/~_._.~ ~_~ TI~: ): LK OUTGOING CALL: NOTES: SIGNED: roof engineerin inc. plaza at riverbend I 1221 riverbend dr., suite 252 dallas, texas 75247 214-63z~-7192 tool cbsk3n, insl~ction, IQborc~orv cuml~is August 24, 1988 Mr. Dale Jackson City of Coppell Coppell Town Center P. O. Box 478 Coppell, Texas 75019 RE: Coppell Town Center Coppell, Texas Dear Dale: As per your request Roof Engineering Inc. would like to submit a fee schedule for consulting work on the repairs of the Coppell Town Center. REI anticipates approximately 8 hours of work in meeting with the general contractor and scheduling work with the subcontractors to get the repairs complete on the project. REI's fee schedule is 875.00 per hour or approximatley $600.00 to consult with the general and subcontractors to have the repairs complete. If you have any questions on this matter, please feel free to call. Sincerely, James 0. Wharry Vice President JOW:df cc: Mr. Jim D. Koontz, ~EI