Loading...
2011_1017 (4)CHECK ONE: / IRRIGATION DOMESTIC FIRELINE BACULOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAZ%E OF PWS: O e- PWS LD. LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker Double Check Valve O Atmosphere Vacuum Breaker Manufacturer 0410, Size 3�`f Model Number 00-1 y- I 4-rr Located At e -� • g- -�-•.� Serial Number 7- `� 9 7 The above is caztified to be true. Firm Name &Ttvn/ A ikT(-' JOE Fiam Address L' & 7q-7 WAx. -M -7516,9 Gauge # D 17 of >V'i - YZ Date last accuracy tested Y-/,// Cect Tester No. EPcw 61-'? Date 10-i I White - Customer's Copy Yellow - v3ty Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAIXR Double Check Valve Assembly Relief V aloe Air Inlet Check Valve 1st Check /Y Znd Check 1. 9 Initial Test DC- Closed Tight /Closed Tight Leaked ❑ Opened psid Opened at osid osid RP- __osid Leaked ❑ Did not Open ❑ Leaked ❑ Repair, and " Materials Used Test After Reps DC- Closed Tight ❑ R p mmmmg�iidd Closed Tight ❑ Opened at osid Opened at osid _,.__. sid The above is caztified to be true. Firm Name &Ttvn/ A ikT(-' JOE Fiam Address L' & 7q-7 WAx. -M -7516,9 Gauge # D 17 of >V'i - YZ Date last accuracy tested Y-/,// Cect Tester No. EPcw 61-'? Date 10-i I White - Customer's Copy Yellow - v3ty Copy Pink - Tester's Copy