Loading...
CF-TownC CHC-CS 861118November 18, 1986 ARCHITECTURE PLANNING · INTERIORS Mr. Frank Trando City Manager City of Coppell 616 Coppell Street Coppell, Texas 75019 Re: Co,Dell Town File No. 8457 Dear Mr. Trando: Subsequent to our meeting and discussions of Tuesday, November 4th, 1986, I provide herewith a brief explanation regarding the Additional Services Billings in question for your review. 1. On Sept. 19, 1985, Mr. Mike Henjum of our office attended a meeting at the offices of Mr. Wayne Ginn, the Cities' representative for this project. Also in attendance were Mayor Lou Duggan, City Secretary, Dorothy Timmons, Police Chief Griffin and Water Superintendent, Steve Goram. I have attached a copy of the meeting minutes from this meeting which clearly indicate the direction given and authorized by the City representatives with regard to project changes, some of which included: A. Modifications to multi-purpose room. B. Addition of court office. C. Modifications to work room No. 213. D. Modifications and possible addition of a toilet Room #234. E.Assistance in the preparation of telephone specifications. F. Security system modifications. -I McKinney Place · 3131 McKinney Avenue · Suite 850 - LB 113 · Dallas, Texas 75204 · (214) 871-9100 2250 Lucien Way · Suite 100 · Maitland, Florida 32~1 · (305) 875-0002 J. E. O'Brien, AIA S.M. O'Brien, VP/Design G. Addition of three vaults. The above modifications were requested by Mayor Duggan and his staff and are Additional Services which are not part of the Architects original scope of work. The hours are noted from September 20, 1985, thru October 31, 1985, and include the preparation of the necessary documents to effect the changes requested and authorized. 2. The next group of dates which you have requested infor- mation regarding cover the period from Jan. 15, 1986, through Feb. 15, 1986. The notations made next to each date by Mr. Ed Powell appear to be accurate. The following is a recap: A. Jan. 15, 1986, Coppell Council presentation at the request of Mr. Frank Proctor, City Manager, we were directed to prepare for a complete presentation for the new City Council to update them on the project design, function, etc. Time cards indicate 12.5 hrs. for Mike Henjum and .5 hours for John Payne in prep- aration for this meeting. Please note that the presentation to the City Council was made by not only Mike Henjum, but also Jack O'Brien and myself, indi- cated as 6.0 hours and 8.0 hours respective. B. Also during this time period a number of requests were made by Mr. Frank Proctor, City Manager, which would modify the Coppell Town Center design. Mr. Frank Proctor requested and authorized our office to proceed with preparation of the necessary documents and proposal requests effecting these changes. A partial list follows: 1. Modifications to Room 212 and 213, P.R. #9. 2. Modifications to pricing and design of vault doors at Rooms 186, 205 and PR #11. 3. Changes to "old" mayors office area, PR#12. 4. Modificatiosn to Room 144, 143, 145, and PR#13. 3. The next group of dates which you have requested information regarding cover the period from Feb. 28, 1986, through May 15, 1986. The hours noted are associated with four (4) main areas, which are: -2 A. The City of Coppell's requests to modify and change the interior design, materials, and colors of the project. This included paint, wallpaper, and carpet to mention only a portion of the proposed changes authorized and requested by Mayor Duggan, Frank Proctor, and the City Council. 1. 3-15-86 Jack O'Brien 2.0 hrs. 2. 3-15-86 Jack O'Brien 2.0 hrs. 3. 3-31-86 M. Henjum 6.0 hrs. 4. 3-31-86 B. McDonnell 23.5 hrs. 5. 3-31-86 S. O'Brien 3.0 hrs. 6. 4-15-86 R. Bertsni 11.5 hrs. 7. 4-15-86 R. Bertani 5.0 hrs. 8. 4-15-86 R. Bertani 3.0 hrs. 9. 4-30-86 R. Bertani 5.0 hrs. 10. 4-30-86 M. Henjum 6.0 hrs. 11. 4-30-86 B. McDonnell 10.0 hrs. 12. 4-30-86 B. McDonnell 6.5 hrs. 13. 5-15-86 R. Bertani 7.0 hrs. 14. 5-15-86 R. Bertani 3.0 hrs. NOTE: The dates noted indicate ending date of time period and not the actual date work was accomplished. B. The second item indicates the installation of the roof deck and roof materials. The General Contractor failed to comply with the Contract Documents with regard to the products and installation of roofing system. These problems were solely caused by and in control of the General Contractor and his Subcontractors. The roof problem caused for additional engineering to be necessary by our office, and also additional inspections, research and testing to be accomplished. (The problems were associ- ated with the I.B.P. slate look roof system and also the Built-Up Roof System where an incorrect and unacceptable installation was noted.) This problem was noted to the City of Coppell representatives prior to any work being accom- plished by our firm. The following is a listing of the hours associated with the problem: 1. 2-28-86 R. Bertani 9.0 hrs. 2. 2-28-86 M. Henjum 3.0 hrs. 3. 3-15-86 R. Bertani 4.0 hrs. C. The third item involves a problem with the structural -3 steel at the roof area not being erected to the heights noted on either the Contract Documents or the approved Shop Drawings or Approved Erection Drawings. The General Contractor and his Subcotractor made modifica- tions in the field which further compounded these problems and also caused for the wood trim on the cornice area to be unlevel. Numerous meetings were held and much additional time was expended by both the architect and structural engineer to come up with a solution to resolve the roof problem caused by the General Contractor and his Subcontractors. Prior to any work being accomplished on this item, the City of Coppell's representatives were appraised of the situation and authorized us to proceed wth a resolution. The costs associated with this work were to be backcharged by the City of Coppell to the General Contractor. The follow- ing is a partial listing of hours spent attempting to resolve this problem: 1. 3-31-86 R. Bertani 15.0 hrs. 2. 4-1-86 T. Callaway 2.0 hrs. 3. 4-15-86 R. Bertani 10.0 hrs. 4. 4-30-86 R. Bertani 15.5 hrs. 5. 4-30-86 R. Bertani 2.5 hrs. 6. 4-30-86 R. Bertani 6.0 hrs. NOTE: This is only a partial listing of time. The overall costs associated with this particular item is noted on the May 28, 1986, billing and is in the amount of $7,794.52. D. The fourth item involves various changes and modifica- tions requested and authorized by Mr. Frank Proctor, for other City personnel. Some of the changes included: 1. Changes in jail area addition of bunks. 2. Addition of window in Police Communication area. 3. Lighting for donated picture at second floor, library lobby. 4. Vinyl and carpet changes in Police Dept. area. A partial listing of hours indicates the following: 1. 2-28-86 C. Johnson 2.0 hrs. -4 2. 4-30-86 R. Bertani 9.0 hrs. 4. With regard to our conversation concerning the billing of Addi- tional Services for graphic and signage consultation, we agreed to invoice the City of Coppell for the actual hours of Belinda McDonnell rather then an original budget allowance established by the City of Coppell and not included in the Archtect's con- tract. The following is a breakdown of hours by pay period and costs associated with this Additional Service. A. 1/31 7 hours $ 279.09 B. 2/15 10 hours 388.70 C. 2/28 15 hours 583.05 D. 4/15 7 hours 272.09 E. 4/30 6 hours 233.72 F. 5/15 2.5 hours 97.18 G. 5/31 1 hour 38.87 Total $1,885.20 Billing No. 3 dated September 24, 1986, has been revised to comply with our Agreement, and is attached herewith. In conclusion, we have provided herewith the information requested concerning the Additional Services noted on your list and hopefully this information answers all questions. Please note that all hours noted are associated with Additional Service work authorized and completed prior to July 7, 1986. Sincerely, Directo~ of Construction Administration cc: Mayor Lou Duggan Ed Powell Jack O' Brien Susan O'Brien Karen Cruz -5