Loading...
2011_0315CHECK ONE: IRRIGATION )O DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. i! LOCATION OF SERVICE: �` ��/'�BI@��} ` . The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker xDouble Check Valve ❑ AunospherejVacuum Breaker Manufacturer (--V Size 3`1i 1' Model Number 75-b Located At Fizooi uR-if-U oar Serial Number dco(po44 The above is certified to be true. dd Firm Name �2vS-f /�l!•C f flow Certified Tester - Firm Address 3 i 13 lee 4iv o k gr - Witj Cert. Tester No. 56,01 Date - �S Tx -70c- / Gauge # �3 Date last accuracy tested )-- f- // White - Customer's Copy 9/4, 5.40ppnzL Yellow - City Copy h1x-. Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test s� DC- Closed Tight R = 3 osid Leaked ❑ Closed Tight Leaked C3 Opened at psid Opened at osid Did not Open ❑ osid Leaked ❑ Repairs and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at osid Repair Tight ❑ osid osid RP sid The above is certified to be true. dd Firm Name �2vS-f /�l!•C f flow Certified Tester - Firm Address 3 i 13 lee 4iv o k gr - Witj Cert. Tester No. 56,01 Date - �S Tx -70c- / Gauge # �3 Date last accuracy tested )-- f- // White - Customer's Copy 9/4, 5.40ppnzL Yellow - City Copy h1x-. Pink - Tester's Copy