CF-TownC CHC-CS 861014Ctiy Engineer
J.M. Foley
Sergeant
14 October 86
Ed:
I was contacted by Bob Wright, of GTE and he informed me
that within the next week, and before the start date of
E911, that a vent must be placed in the equipment room.
The AIR/HEAT vent must have a closeable vent. The vent
in the door for return air should be approx 24'x24'.
This request is to ensure that the Hewlett Packard 3000,
and the rest of the phone equipment does not get too hot
or too cold. This is to avoid damage to the equipment.
If I can be of any assistant please advise.