Loading...
CF-TownC CHC-CS 861014Ctiy Engineer J.M. Foley Sergeant 14 October 86 Ed: I was contacted by Bob Wright, of GTE and he informed me that within the next week, and before the start date of E911, that a vent must be placed in the equipment room. The AIR/HEAT vent must have a closeable vent. The vent in the door for return air should be approx 24'x24'. This request is to ensure that the Hewlett Packard 3000, and the rest of the phone equipment does not get too hot or too cold. This is to avoid damage to the equipment. If I can be of any assistant please advise.