Loading...
Connell Skaggs-CS 920207February 7, 1992 Mr. James Koch Pacheco Koch Co. 9401LBJ Freeway, #250 Dallas, TX 75243-4538 Re: Connell Skaggs Final Acceptance Dear Mr. Koch: A final inspectioh of the above referenced project has been confirmed by representatives of the City of Coppell. The drainage utility has been verified and is in compliance with the City of Coppell sta~k~ard requirements. Erosion protection will also be maintained unti~ bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (February 7, Lg~). Sincerely, Larry Davis Engineering Development Inspector CLD/bd cc: Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wietand, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Dale Jackson, Building Official Danny Buckelew, Buckelew Construction Co., Inc. Phil Cullum, Cullum Construction CONNFIN