Loading...
2011_0506 (5)CFIECK ONEc IRRIGATION DOMESTIC. FIRELINE BACKFI.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I -D. # LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY o Reduced Pressure Principle O Pressure Vacutnn Breaker fl Double Check Valve � Atmosphere Vacuum Breaker Manufacturer Model Number Serial Number Size Located At The above is cetti£ed to be true. Firm Name Firm Address Gauge # Date last accuracy tested .._ =Y— Cent. Tester No. Date White — Customers Copy Yellow —City Copy Pink — Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BRE_�►�'R Double Check Valve Assembly 1st Checl: 2nd Cbecl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tigh[ p Opined at Opined at nsid Tight 7 Leaked - � psid nsid RP- nsid Leaked D Did not Opm � Leaked o Rap airs and Materials Used Test After DC- Closed Closed Tight o Opined at Opined at nsid Rapair Tight � nsid nsid RP std The above is cetti£ed to be true. Firm Name Firm Address Gauge # Date last accuracy tested .._ =Y— Cent. Tester No. Date White — Customers Copy Yellow —City Copy Pink — Tester's Copy