WA9301-CS 980325UAN
March 25,' 1998
Jennifer tottingham, P.E.
Dailas Water Utilities
2121 Main Street, Suite 300
Dallas, TX 75201
DWU r'ACILII'IE5-~ ;~
BAR CONSTRUCTORS, INC.
P:O: to. TX 7st46
Re: Coppell 2 Metering $t~tior~
City of Dallas, Contract No. 94-81
Oear Jennifer:
The following is the shuldown schedule for CopHi Metering Station and Bandy Lake Road.
Coppall Meteriqg S,"tion
T, uee.,. Ma~;ch 31,1998 - Ready for pressure test
Mon.. Apdl, 6; 1998.8:00 s.m, - Shutdown for tie-in
6-n~v Iake Road
Fri.. Mardq ;~7~ 1998 .- Shutdown exiting 24" pipe to remove thruat blocic and Install pipe
from 5'ta. O+O0 1o 0+50
Wed.. April {I..fii98 - Open existing 24" pipe, abutdown existing 36' pipe to install new
pipe & 9x10 vaults from Sta. 0+50 to 2+37
Wed.. April 22, 191)8 - Ready for pressure test
Tuep,,/~ril :~8. 1996 - Shutdown 36" for.tie-in
If you have any questions, pleaSe cell-me.
Sincerely,
~Armmbid~
Vic~-Pmident
JA/19
1/t
00S Katy beet * Telephone (97;g) 227-39-87 * Fax (912) 2197-V043