Loading...
2011_0812 (5)CIIECK ONE. IRRIGATION DOMESTIC FIRELIN E BACi�T.OW PREVENTION ASSEIrIBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE: The bacicflow prevention assembly detailed below has been tested and }rfa;nrained a5 required by TNRCC regulations and is certified to be operating within acceptable parameters_ TYPE OF ASSEMBLY c Reduced Pressure Principle C Pressure Vacutmm Breaker Double Check Valve D Atmosphere Vacuum Brcal:er Manufacturer Model Number Serial Nt>mber Size Located At The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested Certified Tester C�?�s�? Date White - Customer's Copy Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSE2VIBLY PRESSURE VACWM BR�'A�'R Double Check Valve Assembly 1st Check 2nd Cbecl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Ti�hc a Opined at Opined at nsid Ti>dzt o Leaked o nsid nsid RP- vsid Leaked o Did not Opm O Leaked � �Paz� and Materials Used ` Test ARer DC- Closed Closed Tight o Opened at Opined at nsid Repair Tight Q nsid vsid RP sid The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested Certified Tester C�?�s�? Date White - Customer's Copy Yellow -City Copy Pink - Tester's Copy