Loading...
2011_0708ClIECK ONE_ IRRIGATION ll0 M ESTIC FIRELINE BACKFT,OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT �. /_�T.�T.��� +.idyl PWS I.D. # _ LOCATION OF SERVICE: The backllow prevention assembly detailed below has been tested and maintained as required by "I'CEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY D Rrduc. -,d Pressure Principle o Pressure Va�-u� Breaker O Double Check Valve � Atmosphere Vacuum Breaker Manufacturer Model Number Serial Number Size Located At The above is certified to be true. Fitm Name _ Firm Address Gauge # bate last accuracy tested Certified Tester Cent Tester No. Date White — Customer's Copy Yellow —City Copy Pink — Testers Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BRE_A��R Double Check Valve Assembly 1st Checl: 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight � Opined at Opeaed at vsid Tight � Leaked � psid vsid RP- psid Leaked � Did not Opm o Leaked o Repaus and Materials Used Test After DC- Closed Closed Tight o Opined at Opined at vsid Repair Tight [7 psid vsid RP std The above is certified to be true. Fitm Name _ Firm Address Gauge # bate last accuracy tested Certified Tester Cent Tester No. Date White — Customer's Copy Yellow —City Copy Pink — Testers Copy