Loading...
2011_0517 (2)CIIECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFT.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I_D. # LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable paranuters. TYPE OF ASSEMBLY o Reduced Pressure Principle o Pressure Vacua Breaker Q Double Check Valve o Atmosphere Vacuum Breaker Manufacturer -` Size Model Number Located At Serial Number ` The above is certified to be true. Firm Namc Firm Address Gauge # Date last accuracy tested Certified Tester �� � � �%, Y Cent. Tester No.�3 P��'�3 � S 2_ nau �— Wttite - Customer's Copy Yellow -City Copy Pink - Testers Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACWM BFZ_FA►s.'FR Double Check Valve Assembly 1st Chekl: tad Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight E7 "_ Opened at Opened at nsid Tight o --' 'Leaked o psid nsid RP- - nsid LcaI:ed C7 Did noc Open o Locaed o �P�� and Materials Used Test ARer DC- Closed Closed Tight o Opened at Opened at nsid Repair Tight � nsid nsid RP sid The above is certified to be true. Firm Namc Firm Address Gauge # Date last accuracy tested Certified Tester �� � � �%, Y Cent. Tester No.�3 P��'�3 � S 2_ nau �— Wttite - Customer's Copy Yellow -City Copy Pink - Testers Copy