Loading...
2011_0222CHECK ONE: IRRIGATION llOMESTIC FIRELINE BACKFI.OW PREVEN'T'ION ASSEA�LY TEST AND MA71�i'I'ENANCE REPORT NAME OF PWS: PWS I.D. # LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY o Reduced Pressure Principle a Pressure Vacua Breaker � Double Check Valve D Atmosphere Vacuum Breaker Manufacturer Modei Number Serial Number Size Located At The above is certified to be true. Firm Name __ _ Firm Address Gauge # Date last accuracy tested Certified Tester Cent_ Tester No. Date White — Customer's Copy Yellow —City Copy Pink — Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE V ACLTLTM BRE_A�R Double Check Valve Assembly 1st Cher: 2nd Checl: RelieF Valve Air Inlet Check Valve Initial Test DC- Closed Closed Ti�h[ . -r3'" Opened at Opined at vsid Tight o Leaked o psid vsid RP- vsid Leaked o Did not Opm O Leaked 0 Repaus and Materials Used Test After DC- Closed Closed Tight o Opined at Opmcd at vsid Repair Tight o osid vsid RP std The above is certified to be true. Firm Name __ _ Firm Address Gauge # Date last accuracy tested Certified Tester Cent_ Tester No. Date White — Customer's Copy Yellow —City Copy Pink — Tester's Copy