Loading...
CF-TownC CHC-CS 860819 General Telephone Company of the Southwest August 19, 1986 P.O. Box 128 Levisville, TX 75067 214 434-8850 Mr. ~rank ~rando, City Manager City of Coppell P.O. Box 478 Coppell, Texas 75019 I~ar Frank: Listed below are the equipment room requirements necessary to complete the installation of Enhanced 9-1-1. ~ 1. Temperature should be maintained between 65 and 82 degrees F. /~L..~by~The roomneeds an air conditioning duct due to the heat generatedthe equipment. 2wi~. A wall ground bar is needed to common all grounds t.n the room. is ground bar needs to be connected to a cold water pipe ground th #6 wire. ~ ) 3. One 20 amp l17v 60 hz. breaker ~a'~d one 30 amp l17v 60 hz. breaker ~t~ff( needs to be provided. One 30 amp for the power bay (hooked directly \ _from the 30 amp breaker to the E-9-1-1 equipment) is required. The { 20 amp breaker should be wired to a quadruplex (three conductor) / receptacle mounted behind the equipment on the ~11 or mounted on / the equipment. These breakers need to be on the emergency generator power panel. [ 4. A 2-inch conduit needs to be provided from the ~all board in the \ equipeent room to the wall location on the console in the control ~.a room. 5. Sprinklers should not be located in the equipment room. They could cause damage to the equipment if they were activated. The items noted above need to be completed by September 15, 1986, in order to meet the in-service date of October 31, 1986. If you have any questions regarding E-9-1-1 please contact me. Sincerely, J. H. Cowman Test Dispatch Supervisor cc: John Medallle - Las Co!inas Barbara Cartoon - Las Colinas