Loading...
2010_1106c CHECK ONE= IRRIGATION ll0 M ESTIC FIRELINE BACI�Z.OW PREVENTION ASSEMBLY TEST AND MAIN'T'ENANCE REPORT NAME OF PWS: �- ��-�v ;y Cry o O C`� � �_ �z ; �, ;-� �.• r i" PWS I_D- # LOCATION OF SERVICE: _� l =� �� �n Yc; r!J► �1r . The back-flow prcvmtzon assembly detailed below has bem tested and maintained as required by TNRCC rcgulatiotts and is certified to be operating within acceptable parameters_ 'TYPE OF ASSEMBLY o Rcduc„ -d Pressure Principle O Pressure Va�°uL Breaker Double Check Valve e Atmosphere Vacuum Breaker Manufacttser ��✓:��`� ` =� Size Model Number ;��b7 Y1'1 1 % Located At I i �.r� l-� A-S-r �' t lF�.(� Serial Number � � � y� The above is certified to be true. Firm Name r()(1 P� 1 ' ,S ' D - Firm Address { =50� l�rct n�i � f'✓ ;�'"- gauge # �.�"��� �. bate last accuracy tested / �- `c'f'�% ��r✓ White - Customer's Copy Certified Tester /� . 1�'7 r (�/ Ccrt_ Tester No_ �'PC,Y,Y�ln7.� Date f G Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSE1�iBLY PRESSURE VACUUM BFZF,a7.'FR Double Check V aloe Assembly lsf Chec3: 2nd Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight o Opened at Opined at osid Ti�hL a Leaked a psid osid RP- osid Leaked o Did not Opm o Leaked O Rcp arts and MatcriaLs Used Test After DC- Closed Closed Tight � Opened at Opined at osid Repair Tight o osid psid RP sid The above is certified to be true. Firm Name r()(1 P� 1 ' ,S ' D - Firm Address { =50� l�rct n�i � f'✓ ;�'"- gauge # �.�"��� �. bate last accuracy tested / �- `c'f'�% ��r✓ White - Customer's Copy Certified Tester /� . 1�'7 r (�/ Ccrt_ Tester No_ �'PC,Y,Y�ln7.� Date f G Yellow -City Copy Pink - Tester's Copy