Loading...
2011_0620 (5)CHECK ONE: IRRIGATION llO MIESTIC FIRELINE BACKFI.OW PREVENTION ASSEMBLY TEST AND MAIlVI'ENANCE REPORT NAME OF PWS: PWS I_D. # LOCATION OF SERVICE: The backtlow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters_ TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacui� Breaker � Double Check Valve C Atmosphere Vacuum Breaker Manufacturer Model Number Serial Number Size Located At The above is certif � to be true_ Firm Name Firm Address Gauge # bate last accuracy tested Cent Tester No. Date White - Customer's Copy Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY I PRESSURE VACUUM BRF 47� -F'R Double Check Valve Assembly 1st Chet: ?nd Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight o Opened at Opened at psid Ti°laL o Leaked � psid psid RP- pSld Leaked o Did not Open o Leaked o Rep airs and Materials Used Test After DC- Closed Closed Tight D Opened at Opined at osid Repair Tight � osid osid RP sid The above is certif � to be true_ Firm Name Firm Address Gauge # bate last accuracy tested Cent Tester No. Date White - Customer's Copy Yellow -City Copy Pink - Tester's Copy