Loading...
2011_0531 (2)CIiECK ONE: IRRIGATION DO 11°i ESTIC FIRELINE BACKFI.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: -- PWS I_D. # LOCATION OF SERVICE: The backllow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY D Reduced Pressure Principle � Pressure Va�-u� Breaker fr7 Double Check Valve o Atmosphere Vacuum Breaker Manufacturer Model Number Serial Number Size Located At The above is certified to be true. " � Firm Name � �f� r.. � �-' �-'� � '� rLO � Certified Tester �� d i T ,� 14 S Dri/J Firm Address J G� 8 � �P� �l - ��7SQ5 � Cert Testa No. Date � -3 � — �� ,,// T— Gauge # 3�Z T� Date Iast accuracy tested White — Customer's Copy Yellow —City Copy Pink — Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BFLFA�'R Double Check Valve Assembly 1st Checl: 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight q Opined at Opined at osid Tilt t3 Leaked �� psid osid RP- osid Leaked D Did not Open a Leaked o Repairs and Materials Used Test After DC- Closed Closed Tight o Opined at Opined at osid Repair Tight � nsid osid RP sid The above is certified to be true. " � Firm Name � �f� r.. � �-' �-'� � '� rLO � Certified Tester �� d i T ,� 14 S Dri/J Firm Address J G� 8 � �P� �l - ��7SQ5 � Cert Testa No. Date � -3 � — �� ,,// T— Gauge # 3�Z T� Date Iast accuracy tested White — Customer's Copy Yellow —City Copy Pink — Tester's Copy