Loading...
2011_0531 (11)CIIECK ONE. IRRIGATION llOMESTIC FIRELYNE BACKFT.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: _- PWS I_D_ # ___ LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certitied to be operating within acceptable parameters. TYPE OF ASSEMBLY -._ Reduced Pressure Principle a Pressure Vacutmz Breaker o Double Check Valve D Atmosphere Vacuum Breaker Manufacturer Size Modei Number Seriai Number Located At The above is certified to be trite. j � r«L Firm Name • `'' `� � " � ° �� S.s I !t"�� 1 Certified Tester Firm Address S«O//B A VP ry, !L' � 7So�,6 Cert. Testa No. Gauge # _�7Z Tln Date last accuracy tested 3 `3 —� � Date White - Customer's Copy Yellow -City Copy Pink - Testers Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BRE_AT�'R Double Check Valve Assembly 1st Chek3: tad Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight ; �l Openecj at Opened at vsid Tight C7.. Leaked o psid osid RP- vsid Leaked a Did not Open o Leaked � Rtpairs and Materials Used Test After DC- Closed Closed Tight o Opened at Opened at osid Repair Tight 0 osid vsid RP sid The above is certified to be trite. j � r«L Firm Name • `'' `� � " � ° �� S.s I !t"�� 1 Certified Tester Firm Address S«O//B A VP ry, !L' � 7So�,6 Cert. Testa No. Gauge # _�7Z Tln Date last accuracy tested 3 `3 —� � Date White - Customer's Copy Yellow -City Copy Pink - Testers Copy