Loading...
2011_0505 (2)CIIECK ONE= IRRIGATION ll O M ESTIC FIRELINE BACKFT.OW PREVENTION ASSEMBLY TEST AND MA.INI'ENANCE REPORT NAIviE OF PWS: PWS I_D. # LOCATION OF SERVICE: The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters_ TYPE OF ASSEMBLY O Reduces Pressure Principle D Pressure Vacutms Breaker Double Check Valve C Atmosphere Vacuum Breaker Manufacturer Model Ntmmber Serial Number Size Located At The above is certified to be true_ Fitm Namc Firm Address isauge # Date Iast accuracy tested Certified Tester Cert. Tester No. Date White - Customer`s Copy Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEriiBLY I PRESSURE vACLTLIM BRFAI�"F'R Double Check Valve Assembly 1st Check 2nd Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight o Opened at Opened at osid Tight D RP- i �s psid Leaked � psid osid Leai:ed � Did not Open O Leaked o Rcp airs and Materials Used Test ARer DC- Closed Closed Tight o Opened at Opined at osid Repair Tight Q nsid osid RP sid The above is certified to be true_ Fitm Namc Firm Address isauge # Date Iast accuracy tested Certified Tester Cert. Tester No. Date White - Customer`s Copy Yellow -City Copy Pink - Tester's Copy