Loading...
2011_0309CIIECi� ONE: IRRIGATION llOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAI2�iTENANCE REPORT NAME OF PWS: PWS I.D. # LOCATION OF SERVICE: -- - The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certited to be operating within acceptable parameters. TYPE OF ASSEMBLY D Reduc°d Pressure Principle D Pressure Vacutnn Breaker E+- "" Double Check Valve � Atmosphere Vacuum Breaker Manufacttaer Size Model Number Serial Number �, a " "`- r ,� ' Located AL ' The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested Certified Tester <' , _ , (�' i' r' Cent. Tester No_� Date White - Customer's Copy Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEiVIBLY PRESSURE VACUUM BR��R Double Chec3c Valve Assembly 1st Checl: 2nd Check: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight �" Opined at Opened at vsid Ti�at Q" Leaked 0 psid vsid RP- - psid + Leaked � _ � Did not Open O Leaked o �P�� and Materials Used Test ARer DC- Closed Closed Tight o Opined at Opined at vsid Repair Tight o vsid psid RP sid The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested Certified Tester <' , _ , (�' i' r' Cent. Tester No_� Date White - Customer's Copy Yellow -City Copy Pink - Tester's Copy