Connell Skaggs (7-11)-CS 870615The City With A Beautiful Future
June 15, 1987
P.O. Box 478
Coppell, Texas 75019
214 - 462- 0022
Mr. Jim Koch
Powell and Powell Engineers
3988 N. Central Expressway
Suite #1130
Dallas, Texas 75204
RE: Connell/Skaggs, Lot 4, Final Plat
Dear Mr. Koch:
Listed below, please find the fees for ~he above referenced project,
which were calculated by Mr. Gabe Favre of Ginn, Inc., and were made
available to me on June 8, 1987:
S.U.P.
Zoning
Preliminary Plat
Final Plat
Water Availability
Sewer Availability
Water Tap Fees (Assume 2)
· Sewer Connection (Assume 2)
Construction Permit Fees:
1) initial deposit
2) 1.5% construction estimate
3) actual cost
Water Load Test
Street Lights (estimate 3) @ 261.00
Street Signs
Street Assessment:
($100 estimated/Front' Foot)
Utility Inspection Fee
FEES DUE
TOTAL FEES 6-18-87
* 615.00 -
* 104.00 -
* 125.88 -
808.00 404.00
100.00 100.00
i00.00 100.00
847.00 847.00
to be determined -
to be determined -
to be determined -
783.00 -
to be. determined -
16,723.00
150.00
$1,451.00
* These fees have been paid
The amount of' $1,451.00.is due before .June 18, 1987 at 2:00 p.m., prior
to Final Plat approval by the City Council on June 23,'1987.
Please call me at 462-0022, extension 249; or Gabe Favre at 248-4900 if
.you have any questions.
.Sincerely,
'Shohre Daneshmand
Civil. Engineer
SD/lsg
cc:
Frank Trando, Director bf Finance
Gabe. Favre, Ginn, Inc.
Taryon Bowma~,'P & Z Coordinator -
Steve Goram, Director of Public Works
CONNELL/FEES
PZAGN
June 15, 1987
Memorandum
To:
From:
Re:
Frank Trando, Finance Director
Shohre Daneshmand, Civil Engineer
Connell Skaggs - Lot 4
Per your request, please find below fees for the above
referenced project, which were made available to me by
Gabe Favre, on June 8, 1987.
Total Fees
S.U.P.
Zoning
Preliminary Plat
Final Plat
Water Avai] ability
Sewer Availability
Water Tap Fees (ass~ne 2 )
Sewer Connection ( assu~e 2 )
Construction Permit Fees 1. initial deposit
2. 1.5% construction estimate
3. act,_~_ ] cost
Water Load Test
Street Lights (estimate 3) @ $261.00
615.00
104.00
128.00
808.00
100.00
100.00
847.00
to be determined
to be determined
to be determined
783.00
Street Signs to be determined
Street Assessment ($100 estimated/Front Foot) 16,723.00
Utility Inspection Fee 150.00
* These fees have been paid
Fees Due
6-18-87
* 615.00
* 104.00
* 128.00
404.00
100.00
100.00
847.00
$1,451.00
cc: Taryon Bowman
Gabe Favre
Jim Koch