Loading...
2012_0601CIIECK ONE: IRRIGATION V DOMESTIC FIRELIN BACKFI.OW PREVENTION ASSE1ViBLY TEST AND MAIIV'TENANCE REPORT NAME OF PWS. CITY OF COPPELL PWS I.D- # LOCATION OF SERVICE: ����Zo� �i Z 3 ) 3 ' l l% - g � l -�/ � rt a 1��' - � C1� � n,PT� �� 7 S � • � `j The bacicflow prcvmtion asscmbiy detailed below has bem tested sad maintained a5 required by TNRCC rcQUlatiotis and is certified to be operating within acceptable parameters. C �� Maaufacnacr Modci Number Rtduced Pressasc Principle Double C/Jheck Valve �i� � � �� � � � Serial Number F� c� ?�Cf "7� TYPE OF ASSEMBLY C Pressure Vacutnn Breaker � Atmosphere Vacuum Breaker Size Located At -%� s � 1 /�-f' Si d(1� � 5"� f� The above is certified to be tnre. Firm Natne �' At.Y,GI.....i �G�+j ;�G- Certified Tester '�ifi13'(�C -L=S ,R • <� -.�-i t� Firm Address/}. � `-`X- S t� � Cert Tester No. �'� F v,% � s7 � +f Date o " ! - ( �� `�C-N ram. Tx "1 b zvL Gauge # � � 2C 3 �� Date last accuracy tested % -�-(� ��X z White - Customer's Copy Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BRF °�R Double Check Valve Assembly Relief Valve Air Islet Check Valve 1st Checl: 2nd Check Ininal Test DC- Closed �, Closed Tight Opined at Opened at osid t `�, � � _ - 1-ighi � osid � �- L,cakcd 0 % `� osid nsid Did not Opm o Leaked � � Repairs and Materials Used -rat ARer DC- Closed Closed Tight o Opined at Opined at osid Repair Tight o osid osid gp sid The above is certified to be tnre. Firm Natne �' At.Y,GI.....i �G�+j ;�G- Certified Tester '�ifi13'(�C -L=S ,R • <� -.�-i t� Firm Address/}. � `-`X- S t� � Cert Tester No. �'� F v,% � s7 � +f Date o " ! - ( �� `�C-N ram. Tx "1 b zvL Gauge # � � 2C 3 �� Date last accuracy tested % -�-(� ��X z White - Customer's Copy Yellow -City Copy Pink - Tester's Copy