Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-TownC CHC-CS 860527
HOWARD U. FREEMAN, INC., 1424 E. Grauwyler I P.O. Box 151657 1 Irving, Texas 75015 1 (214) 438.6044 Commercial Builders May 27, 19~ City of Coppell 616 S. Coppell Street Coppell, Texas 75019 Attention: Mr. Frank Proctor City Manager Re: Coppell Town Center Gentlemen: Attached please find three (3) copies of Change Order 911 signed by us. Please sign and return one (1) fully executed copy for our files. very truly yours, ~ HOWARD U. FREEMAN~~ / / Jack Waschitz ~ ~ / General Manager~ ~ JW/ds Enclosures cc: Q'Brien, O'Brien, Callaway - Rick Bertani CHANGE ORDER ARCHI'I'I]CI' INq O'grien O'Br.ie~ Cal. l. away ~IA I)OCUMENf (;701 CONTI~ACTOR Ikq Iloward U. Freet,~m - J. gosquez PR()JI~CT: Coppel. l Town Cenker CIIANGE ORDER NUMBER: Eleven (name, address) Parkway glvd. Coppel}, Texas INITIATION [DATE: Hay 22~ 1986 T() (Conlractor): ARCHn'ECT'S PROJECT NO: 845Y Howard U. Freeman, Inc. C()NTRACT FOR: Genera} ConsLrucELon 1624 E. Grau~ler ]rvLng, Texas 75015 CONTRACT DAT[: March 28, 1985 You are directed to make the following changes in this Contract: Provide and install two (2) 4" PVC sweeping L's conduits at the electrical transformer location per Proposal Request No. Two (2) dated 12-19-86 This change was required due to changes in electrical service roofing by Univest the Developer and results in an add to the original Contract Amount of $268.00. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) CCo'xt~~~sg) was ........................... $ 2,528,586 .O0 Net change by previously authorized Change Orders ................................... $ 7,508 .OO The (Contract Sum) (;CX~mt3x'h~d~/X4~l~l:~:~g; prior to this Change Order was .......... $ 2,536,094.00 The (Contract Sum) ~l~:kWk~:~ will be (increased) ~~:0~:J~) by this Change Order ......................................................... $ 268.00 The new (Contract Sum) (~l~':f4~:~C~l~:~O~X~l~g including this Change Order will be ... $ 2,536,362.00 The Contract Time will be ~[K~ea~×~0Je~ (unchanged) by ( -0- ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: O'grien O'grien Callaway Howard U. Freeman, Inc. City of Coppell A~3RCH IT ECT /-- 131 McKiTfne~ Ave., 11850 C~A~}~wYler ~y~E~. Coppell Street Address // ///') ! Address . Address Dalals,~f~s ~204 750 Coppell, Texas 75019 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G~01 -- 197'8 CHANGE I)p,t~ihuti(m h): ORDER ows~r l.X'. City of Coppell - Frank Pt:octet ARCHII'ECT IN~ O'Brten 0~B175c,~ Cal. l. nway AIA I)OCUMI;NI' ~;701 c "' ¥ ' ONIRAC] )Ix IX~ ltoward U. Preum4tn - d. Bosquez I I(!L() l_l I'I{()II!CT: Coppell Town Center C}IANGE ORDER NUMBER: Eleven (11) (name, address} Parkway Blvd. Copl~ell, Texns INITIATION DATE: May 22, 1986 TO (Contrncto,'): ARCHITECT'S PROJECT NO: 8457 Howard U. E~eeman, ]nc. CONTRACT FOR: General Construction ~424 g. Orau~er ~ving, ?exas 750~5 ! I CONTRACT DATE: March 28, 1985 You are directed to make the following changes in this Contract: Provide and install two (2) 4" PVC sweeping L's conduits at the electrical transformer location per Proposal Request No. Two (2) dated 12-19-86 This change was required due to changes in electrical service roofing by Univest the Developer and results in an add to the original Contract Amount of $268.00. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) CCoX~~rX"d4R'k4i~) was ........................... $ 2,528,586.00 Net change by previously authorized Change Orders ................................... $ 7,508 o00 The (Contract Sum) ~~~Jw~:t~X:gl~RtJ prior to this Change Order was .......... $ 2,536,094.00 The (Contract Sum) ~7xt~:~~~~ will be (increased} [d~'/tm:~x%nd~t:tl~l) by this Change Order ......................................................... $ 268.00 The new (Contract Sum) (~,,l~'~l~:J:/es~h:ml~g including this Change Order will be ... $ 2,536,362.00 The Contract Time will be ~m"~adX~,de~ (unchanged} by ( -0- } Days. The Date of Substantial Completion as of the date of this Change Order therefore is ~ ,,~ Authorized: O'Brien en Callaway Howard U. Freeman, Inc. City of Coppell ARCHITECT/ / 3 131 Mc~inm y/Ave~, #850 C~N~A~wYler (~y~E~. Coppell Street Address / // ~ // Ad ss Address la Texas 75015 Coppell, Texas 75019 BY i\~i' t 1/I, ? BY AIA DOCUMENT fi701 · CHANGE ORDER .?RIL 1978 EDITION AIA® © 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D,C. 20006 G701 ~ 1978 CHANGE '" I h~,t~d)tJtiOn h): ORDER ARCI-III'I~C'I' IX~ O'Brien O'Bricl, Callaway AIA I)OCUMI;NI' (;701 CONTRACTOR IX1 Ilaward U. Freeman - J. Bosquez I II!Ll) I_1 PR()JECT' Coppel~ Town Center CItANGE ORDER NUMBER: Eleven (~1) (name, address) Parkway Blvd. Coppell, Texas INITIATION DATE: ~ay 22, 1986 T() (Conlractor): I [ , CHltecrs PrOjeCt 0:8,s7 Howard U. Freeman, Inc. CONTRACT FOR: General Construction 1424 E. Orau~ler Irving, Texas 75015 CONTRACT DATE: March 28, 1985 You are directed 1o make lhe following changes in this Contract: Provide and install two (2) 4" PVC sweeping L's conduits at the electrical transformer location per Proposal Request No. Two (2) dated 12-19-86 This change was required due to changes in electrical service roofing by Univest the Developer and results in an add to the original Contract Amount of $268.00. Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (-¢a~lk-'~x~i~li:~,iR!~iif) was ........................... $ 2,528,586.00 Net change by previously authorized Change Orders ................................... $ 7,508.00 The (Contract Sum) ~~~~l prior to this Change Order was .......... $ 2,536,094.00 The (Contract Sum) ~~~~ will be (increased) ~~~x~) by this Change Order ......................................................... $ 268.00 The new (Contract Sum) (~a~~~ including this Change Order will be ... $ 2,536,362.00 The Contract Time will be ~~X~ (unchanged) by ( -0- ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: O'Brien O'Brien Callaway Howard U. Freeman, Inc. City of Coppell RCHITECT 131 McKi~ey Ave., #850 C~A~Wier ~gE~. Coppell Street Dalals,/Te~204 ~ng, Texas 75015 ~) Coppell, Texas 75019 AIA DOCUMENT G701 · CHANGE ORDERWAPRIL 1978 EDITION · All® · ~ 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701 --1978