Loading...
2012_0510 (3)CIIECK ONE. IRRIGATION DOMESTIC FIRELINE BACKFT.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF Pws_ CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE§ ��� ���TH��- The bacicflow prevention assembly detailad below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable par-mmeters_ TYPE OF ASSEMBLY C Reduced Pressure Principle a Pressure Vacutmm Breaker � Doubie Check Valvo� fl Atmosphere Vacuuffi Breaker Maaufacuaer Modei Number Serial Number Size iocated At � I � r i'-� �- t--� -� The above is ca-tified to be true. Firm Name a �- x`71 [> 1-� � �� Certified Tester, � � K-� L't-�� LL. % f9YVLS Famm Addrea8' � � � � (� x i�17 , _ Ccrt_ Tester Nos �17 (x�l 7 L>rL �,� � S " /b-7 2 Gauge �* LXp ��/ ! -j �i t7 Date Last accuracy tested � � 2 ' � Z White - Customer's Copy Yellow -City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BRFAT�R Doubie Cheek Valve Assembly 1st Check tad Chccl: Relief Valve Air Inlet Cheek Valve Initial Test DC- Closed Tight G3 Closed Tight o Leaked o Opened at vsid Opened at osid vsid RP- vsid ��� p Did not Opm o Leaked '� RePa:. -e and Materials Used Test Aftu Repair DC- Closed Tight o Closed Tight t7 Opined at vsid Opened at vsid vsid RP sid The above is ca-tified to be true. Firm Name a �- x`71 [> 1-� � �� Certified Tester, � � K-� L't-�� LL. % f9YVLS Famm Addrea8' � � � � (� x i�17 , _ Ccrt_ Tester Nos �17 (x�l 7 L>rL �,� � S " /b-7 2 Gauge �* LXp ��/ ! -j �i t7 Date Last accuracy tested � � 2 ' � Z White - Customer's Copy Yellow -City Copy Pink - Tester's Copy