Loading...
2012_0126CHECK ONE. IRRIGATION � DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAII�iT'ENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I_D. # LOCATION OF SERVICE: a - %C:(lc lJi� The bacl. -flow pn_wmtion assembly detailed below has been tested and main a;*,ed as required by TNRCC reguiations aad is ca-tificd to be operating within acceptable parameters. TYPE OF ASSEMBLY c Reduced Pressure Principle a Pressure Vacuum Breaker . Double Check Valve O Atmosphere Vacuum Straker Maaufacnaer Modei Number Serial Nimmber Size Located At The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested Certified Testa Cent Testa No. Date White — Customer's Copy Yellow —City Copy Pink — Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BFZF'AT�'R Double Check Valve Assembly 1st Cheri: 2nd Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight D Opened at Opened at osid Tight o Leaked � nsid osid RP- osid waked p Did not Open O Leaked � Repairs and Mata-ials Used Test After DC- Closed Closed Tight o Opened at Opined at osid Repair Tight � nsid osid RP sid The above is certified to be true. Firm Name Firm Address Gauge # Date last accuracy tested Certified Testa Cent Testa No. Date White — Customer's Copy Yellow —City Copy Pink — Tester's Copy