Loading...
2012_1026CIIECK ONE. IRRIGATION DOMESTIC FIRELINE BACI�T.OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPELL PWS I.D_ # LOCATION OF SERVICE: `� C� I�-i _TAX- �__.t/y �-� The bacicflow prevention assembly detailed below has been tested and maintained as required by TNRCC rcgulatioris and is certified to be operating within acceptable parameters_ TYPE OF ASSEMBLY e Reduced Pressure Principle a Pressure Vacuinn Breaks Double Check Valve D Atmosphere Vacuum Brzaker fi Manufacturer ��' Model Number ��� Seria! Number �/ '�i � � Size Located At The above is certified to be true. Firm Name Firm Address Gauge # Date last accttracy testes Certified Testa Cert. Tester No. Date white - customers copy Yellow -City Copy Pink - Testers copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM B�F'AT�'R Double Check Valve Assembly 1st Check ?ad Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight E1" Opined at Opened at vsid Tight o Leaked o vsid osid RP- vsid Leaked o Did not Opea o Leaked o Repairs and Materials Used Test Attu DC- Closed Closed Tight o Opmecl at Opened at osid Repair Tight o vsid osid RP sid The above is certified to be true. Firm Name Firm Address Gauge # Date last accttracy testes Certified Testa Cert. Tester No. Date white - customers copy Yellow -City Copy Pink - Testers copy