Loading...
2012_1026CIIECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFI..OW PREVENTION ASSEMBLY TEST ANL MAINTENANCE REPORT NAME OF Pws: CITY OF COPPELL PWS I.D. # LOCATION OF SERVICE: Cf U� Cf ± _ � � The bac1.-flow prcvmtion assembly detailed below has bem tested and maintained as required by TNRCC regulations and is ccx-cified to be operating within acceptable parameters_ TYPE OF ASSEMBLY e Reduced Pressure Principle a Pressure Vacut_***+ Breaker �_^_ Double Check Valve � Atmosphere Vacuum BreakQ f Maaufacttffer - Size r Model Number Located At �Ti�-- � -1�ir° Serial Number The above is certified to be true. Firm Name � �-` ���' � �r -� "/ Certified Teste � >�' '' �T!!�s��- � Firm Address r/� -- �-�'"� �/ /� /���ert. Tester No. Date 1� �G ��- Gauge # .�U �l %� � � � Date �ACt a��ura�y testes �� /6 -// REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BRF'A�'R Double Cber3c Valve Assembly 1st Checit 2nd Checl: Relief Valve Air Inlet Check Valve Initial Test DC- Closed'.�� Closed Tigh� Opined at Opined at vsid Tight C7� Leaked';�,�'i a vsid vsid RP- vsid L,�� o Did not Opm o Leaked � RePa;.� and Materials Used Test ARer DC- Closed Closed Tight O Opined at Opined at vsid Repair Tight D vsid vsid RP sid The above is certified to be true. Firm Name � �-` ���' � �r -� "/ Certified Teste � >�' '' �T!!�s��- � Firm Address r/� -- �-�'"� �/ /� /���ert. Tester No. Date 1� �G ��- Gauge # .�U �l %� � � � Date �ACt a��ura�y testes �� /6 -//