Riverchase (6.2)-CS 980126/~--) The City With A Beautiful Future
P.O. BOX 478
COPPELL, TEXAS 7,5019
P.O. Box 478
Coppell. Texas 75019
972-462-0022
FIL
January 26, ~I998
Fehmi Karahan
Riverchase Plaza, Ltd.
5429 LBJ Freeway, Suite 340
Dallas, TX 75240
Grand Car Wash Addition, Lot 1 (Coppell Commons)
Development Fee Assessment
Dear Mr Karahan:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $8,581.95 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ~)
Ke~e~.~, ¢. E.
Director of Engineering & Public Works
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project:
Date:
Grand Car Wash Addition, Lot 2 (Coppell Commons)
1/26/98
Water Impact Fee
(100 % due prior to Council Approval)
TOTAL AMOUNT DUE I!
FEES DUE PRIOR TO
COUNCIL
APPROVAL
$2,250.00 $2,250.00
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
$57.75
Water Meter Fee (Domestic)
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
(100% due at Issuance of Water Meter)
$57.75
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,125.00 $1,125.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $5,206.95 $5,206.95
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $8,962.45
$8,581.95
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
DEVELOPMENT FEE WORKSHEET
PROJECT: Grand Car Wash Addition, Lot 2 (Coppell Commons)
DATE: 1/26/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
1 - 1 inch
1 - 1 inch
2.5
2.5
Fireline Meter(s):
Total #: 5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due p~ior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $57.75
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$57.75
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
2.5
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ali developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$2,250.00
$100.00
$57.75
$57.75
$0.00
$0.00
$35.00
$30.00
$1,125.00
$50.00
$50.00
Page 3
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$5,206.95
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 4
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Grand Car Wash Addition, Lot 1 (Coppell Commons)
1/26/98
ROADWAY IMPACT FEE:
Service Area *
Cate§ory **
Land Use **
Buildin~ Size (ScI. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
7
Office
General Office Buildint~
4,350
4.35
3.99
$300
Roadway Impact Fee due = (Development Units) x
~ehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
$5,206.95
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)