Loading...
Riverchase (6.2)-CS 980126/~--) The City With A Beautiful Future P.O. BOX 478 COPPELL, TEXAS 7,5019 P.O. Box 478 Coppell. Texas 75019 972-462-0022 FIL January 26, ~I998 Fehmi Karahan Riverchase Plaza, Ltd. 5429 LBJ Freeway, Suite 340 Dallas, TX 75240 Grand Car Wash Addition, Lot 1 (Coppell Commons) Development Fee Assessment Dear Mr Karahan: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $8,581.95 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~) Ke~e~.~, ¢. E. Director of Engineering & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Date: Grand Car Wash Addition, Lot 2 (Coppell Commons) 1/26/98 Water Impact Fee (100 % due prior to Council Approval) TOTAL AMOUNT DUE I! FEES DUE PRIOR TO COUNCIL APPROVAL $2,250.00 $2,250.00 Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) $57.75 Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) $57.75 Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $5,206.95 $5,206.95 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $8,962.45 $8,581.95 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL DEVELOPMENT FEE WORKSHEET PROJECT: Grand Car Wash Addition, Lot 2 (Coppell Commons) DATE: 1/26/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 1 - 1 inch 1 - 1 inch 2.5 2.5 Fireline Meter(s): Total #: 5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due p~ior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $57.75 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $57.75 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 2.5 $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ali developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $2,250.00 $100.00 $57.75 $57.75 $0.00 $0.00 $35.00 $30.00 $1,125.00 $50.00 $50.00 Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $5,206.95 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 4 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Grand Car Wash Addition, Lot 1 (Coppell Commons) 1/26/98 ROADWAY IMPACT FEE: Service Area * Cate§ory ** Land Use ** Buildin~ Size (ScI. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** 7 Office General Office Buildint~ 4,350 4.35 3.99 $300 Roadway Impact Fee due = (Development Units) x ~ehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $5,206.95 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)