Townhomes Ph 2-PT140328 A copy of the approved permit must be on the job site at all tim CC: ApplicantPage 1 of 4 Public Works Rev. 06/2012 Permit File Orig. to Project File RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept., Town Center, 03/28/143PFA0YJ Date of Submittal: Applicants Job # / Work Order # PERMIT FEE:$100.00 (No charge to Utility Companies with approved Franchise/ROW Use YesNo Refer to the City of Coppell Ordinance No. 2001-944. Certificat (Erosion Control/Safety fences must be installed prior to beginn Plans provided and approved Old Town Phase II Project Name/Location or address Henkel's & McCoy972-512-2900 General ContractorContact # martinez.mike@verizon.com E-mail address to return permit Paul Messenheimer Representative: Franchise 972-318-5186 Telephone #: Company: paul.m.messenheimer@one.verizon.com E-mail address: (for contact if needed/if e-mail of approved permit is desired/p Utility Company Represented: Verizon Oncor Electric Delivery Atmos EnergySBC/ AT&T Time Warner Cable CoServ Electric/GasOther General Description of Work : PLEASE ATTACH PLAN OF PROPOSED WORK (In accordance with Ord. No. 2001-944) Extend conduit from existing joint trench conduit on S Coppell St to existing Verizon handhole on Houston St. Estimated Start Date Estimated Completion Date* 04/14/1405/16/14 * Completion requires submittal of Completion Verification Notic Was contact made with City and/or utility companies to locate ex Ú Yes No if NO, Reason: Contact City 48 hrs prior to construction. Is removal of existing streets, alleys, or sidewalks necessary? Ú Yes No if YES, project must have City inspection prior to concrete repl Right-of-Way Use Permit Application Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense) and barricading according to the Texas Manu Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, To schedule Public Works final inspection (Page 4) call 972-462- vegetation, and erosion control). Any excavation requiring closing of a street/alley must be repor Ú Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 Attach barricade plan / trench safety plan if a lane or street c Ú Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City NOTE: Engineer. Ú Attach Work Order (franchise only) and/or 1 set of prints showin Locates for existing franchise utilities must be done 48 hours p For City utility locates, call 972-462-5155 to schedule 48 hours The application with signatures of Franchise and Contractor repr Dept. for approval prior to beginning work. Submittals by e-maiengineer@coppelltx.gov. Printing your name indicates your acceptance of the terms and co ( if you want the approved permit returned via e-mail, provide a v Paul Messenheimer 03/28/14 Signature of Utility Company RepresentativeDate Steve Forsythe03/28/14 Signature of Contractor RepresentativeDate Signature of City RepresentativeDate Comments NOTE:Notify City Inspector at 972-304-3679 prior to beginning work and prior to Ú backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Page 3 of 4 UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation pro A copy of the valid approved City of Coppell permit is required 1. Notify adjacent property owners (commercial & residential) of pr 2. names and phone numbers. Proper erosion control measures must be taken. 3. Follow Texas MUTCD standards for work in traffic zones. 4. Sod is to be replaced when necessary. 5. Irrigation repairs must be performed in a timely manner. 6. Follow OSHA recommended trench safety at all times. 7. Repair existing utilities that are damaged, including but not li 8. manholes. Densities may be required in trench lines (ASTM). 9. Care and repair of street signage is the responsibility of the c 10. No work is to be done in collector roadways before 9:00 a.m. or 11. Prior notice of work activity on weekends and holidays must be i 12. Line locates must be performed in advance by contacting - 13. 1 800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utility-operations-division 972/ 462-5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304-3679 HOMEOWNER ASSOCIATIONS 972/ 304-3678 (Planning Department) TIME WARNER CABLEFEDERAL EMERGENCY MGMT. ADMIN. 940/ 898-5138 214/ 320-5455 (Mike Rasmussen) AT&T LOCAL NETWORKTEXAS COMM. on ENVIRONMENTAL QUALITY 214/ 215-3031 (Rich Millenman)817/ 588-5800 COSERV Gas & ElectricDENTON CO. LEVEE DISTRICT (Greg Ward)214/ 352-5118 (Richard Hightower) 940/ 321-7800 x 7624 EXPLORER PIPELINEAtmos Energy 972/360-4428 (Gary Dickinson) 918/ 493-5100 (Patrick Nwakoby) ONCOR Electric Delivery 972/ 323-8917 (Larry Redick) VERIZON COMMUNICATIONS 1 800 DIG TESS for line locates (344 - 8377) 972/ 318-5277 14.Contaminants must be removed from work area daily and dispose 15.Streets, sidewalks and alleys must be kept clean of construct 16.Clean-up requires returning work area to pre-project condit 17.Contractor is required to contact Public Works Division for C Page 4 of 4 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future pro Franchise Utility Name Project Location / Applicant's Work Order # (if applicable) Sub-contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORK of Utilities Maintenance Division on Inspected by µ and found to be acceptable / not acceptable because Follow-up needed? Follow-up scheduled for Yes No Inspected by of Streets Maintenance Division on µ and found to be acceptable / not acceptable because Follow-up needed? Follow-up scheduled for Yes No A copy of this completed notice can be provided to the address b or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Submit by E-mailPrint Form