Loading...
CF-Police/Ct Lot-LR 990127 Maxim Technologies Inc. 2575 Lone Star Drive Dallas, Texas 75212 T E ¢ H N O L O G I E $ I N ¢ Telephone= (214) 631-2700 FAX: (214) 920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: ABCON CONSTRUCTION Attn: Rusty Whitaker PAGE 1 OF 2 1045 E. HWY 121 Lewisville, TX 75057 PROJECT NO.: 9710310 REPORT NO.: 143979 PROJECT: Pavement Renovation -Coppell DATE OF SERVICE: 1/20/99 Texas, Various AUTHORIZATION: Rusty 130 TOWN CENTER BOULEVARD REPORT DATE: 1/27/99 SERVICES: sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. PROJECT DATA CONTRACTOR: ABCON CONTRUCTION CLASS OF CONCRETE: 110+9265 CONCRETE SUPPLIER: Redi-mix DATE OF PLACEMENT: 1/20/99 PLANT: 10 TIME SAMPLED: 09: 15AM BY: Chris Taylor SPECIFICATION REQUIREMENTS TEMPERATURE {OegF) - AIR: 70 CONCRETE: 74 STRENGTH: 3000psi @ 28 DAYS TRUCK NO: 125 TICKET NO: 101923 SLUMP: 6" max~num AIR: na MEASURED SLUMP (in.): 6.25 METHOD OF TEST AIR CONTENT(%}: 5.4 UNIT WEIGHT(pcf}: na SAMPLING: ASTM C-172 LOCATION OF PLACEMENT: MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 police court parking lot, 30 feet of street, TEMPERATURE: ASTM C1064 10 feet north of edge of paving AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C1231 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED (days) (in.} {sq.in.} (lbs. force) (psi} FRACTURE TYPE REMARKS 1 1 1/27/99 7 6.00 28.27 85760 3030 UNBONDED CAP I 2 2/17/99 28 1 3 2/17/99 28 1 4 HOLD Technician: Chris Taylor Started: 07:30AM Stopped: iO:30AM Report Of Tests Continued On Page 2 Our I~t'terl Ind repo~ts ere for the exclusive use of the client to whom they ire erf~re~ed end oh'dl not be relxoduced excel=t in full w~hout the al~rovat of the te~tin{i !aboratory. The [me of. o? n.ame must recew~.our written approval. Our letters and rel3orts 1001 M apply only to the Ilmplo te~ted and/or ~f'mpectod, and ~e n~t indicative of the qulntitiel of apparently identJcld or similar l~'oduct'l. ABCON CONSTRUCTION REPORT NO. 143979 PROJECT NO. 9710310 PAGE 2 OF 2 DATE OF SERVICE: 1/20/99 SET NO. 2 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cent inued) PROJECT DATA CONTRACTOR: ABCON CONTRUCTION CLASS OF CONCRETE: 110+9265 CONCRETE SUPPLIER: Redi-mix DATE OF PLACEMENT: 1/20/99 PLANT: 10 TIME SAMPLED: 10: 35AM BY: Chris Taylor SPECIFICATION REQUIREMENTS TEMPERATURE (DagF) - AIR: 72 CONCRETE: 76 STRENGTH: 3000psi @ 28 DAYS TRUCK NO: 627 TICKET NO: 17850 SLUMP: 6" maximum AIR: na MEASURED SLUMP (in.): 6.00 METHOD OF TEST AIR CONTENT(%): 5.7 SAMPLING: ASTM C-172 LOCATION OF PLACEMENT: MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 45 feet east of first location, 20 feet TEMPERATURE: ASTM C1064 north of curb line AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C1231 TESTING: AS'~[ C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED (days) (in.) (sq.in.) (lbs. force) (psi) FRACTURE TYPE REMARKS 2 1 1/27/99 7 6.00 28.27 80760 2860 UNBONDED CAP 2 2 2/17/99 28 2 3 2/17/99 28 2 4 HOLD Technician: Chris Taylor Started: 07:30AM Stopped: 10:30AM Report Distribution: (1) ABCON CONSTRUCTION .~ c~ ~ c,,..~, NC. Our lettera and report~ ate for the exclusive Lme of the client to whom they are addre~eed and eh~l no~.re~_rodHced except in full without the a~prov,d of the tearing laboratory. The uae of our name mult receive our writt~h ap?'ovll. Our lettorl and repo~ts 1001 M apply only to the lample teal:ed and/or inspected, and are not indicative of the quantitiel of apl~ltentl¥, identic,a or eimilat productl.