Duke Lesley 2RC-CS140422
Halie Hernandez
From:Michael Garza
Sent:Tuesday, April 22, 2014 4:15 PM
To:Jim Dewey Jr.
Cc:Debra Cox; Matthew Blaxton; Halie Hernandez
Subject:RE: Four Points Hotel
Jim,
The only comments I have are: 1) Where you change from hdpe to rcp you will need to connect via a junction box.
2) include a profile for the private sanitary sewer. 3) 2-2” domestic meters would be about $19,000 cheaper in impact
fees than 1-4” meter.
Please revise the plans and submit to us 3 sets for our use and however many the contractor will need for us to stamp
for approval. Once the inspection fees are paid we can set up a pre-con.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
Engineering Department
City of Coppell, TX
www.coppelltx.gov
972-304-7019 (office)
Please take our customer service survey
From: Jim Dewey Jr. [mailto:jdjr@jdjr.com]
Sent: Tuesday, April 22, 2014 10:06 AM
To: Michael Garza
Cc: Debra Cox; Matthew Blaxton
Subject: RE: Four Points Hotel
Mike:
The only substantial revision is the off-site storm drain. The adjacent owner would not agree to an easement, so we are
having to go down the street. We understand we will have to remove and replace full panels.
Jim Dewey, Jr.
JDJR Engineers & Consultants, Inc.
2500 Texas Drive Suite 100
Irving, Texas 75062
1
Tel: 972-252-5357
Fax: 972-252-8958
From: Michael Garza [mailto:MGarza@coppelltx.gov]
Sent: Monday, April 21, 2014 6:18 PM
To: Jim Dewey Jr.
Cc: Debra Cox; Matthew Blaxton
Subject: RE: Four Points Hotel
Jim,
Ill look at them first thing in the morning, if there weren’t many changes from the last submittal months ago then they
should be ready to go. We will need the permit attached filled out and inspection fees paid. Once these fees are paid we
can then set up a pre-construction meeting, possibly for later this week or early next week.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
Engineering Department
City of Coppell, TX
www.coppelltx.gov
972-304-7019 (office)
Please take our customer service survey
From: Jim Dewey Jr. [mailto:jdjr@jdjr.com]
Sent: Monday, April 21, 2014 6:10 PM
To: Michael Garza
Cc: Debra Cox; Matthew Blaxton
Subject: Four Points Hotel
Mike:
Have you had a chance to review the revised civils? The contractor is anxious to start dirtwork, etc.
Jim Dewey, Jr.
JDJR Engineers & Consultants, Inc.
2500 Texas Drive Suite 100
Irving, Texas 75062
Tel: 972-252-5357
Fax: 972-252-8958
2