Duke Lesley 2RC-CS140422 (2) Halie Hernandez From:Jim Dewey Jr. <jdjr@jdjr.com> Sent:Tuesday, April 22, 2014 4:18 PM To:Michael Garza Cc:Debra Cox; Matthew Blaxton; Halie Hernandez Subject:RE: Four Points Hotel Thanks for the prompt response. Jim Dewey, Jr. JDJR Engineers & Consultants, Inc. 2500 Texas Drive Suite 100 Irving, Texas 75062 Tel: 972-252-5357 Fax: 972-252-8958 From: Michael Garza [mailto:MGarza@coppelltx.gov] Sent: Tuesday, April 22, 2014 4:15 PM To: Jim Dewey Jr. Cc: Debra Cox; Matthew Blaxton; Halie Hernandez Subject: RE: Four Points Hotel Jim, The only comments I have are: 1) Where you change from hdpe to rcp you will need to connect via a junction box. 2) include a profile for the private sanitary sewer. 3) 2-2” domestic meters would be about $19,000 cheaper in impact fees than 1-4” meter. Please revise the plans and submit to us 3 sets for our use and however many the contractor will need for us to stamp for approval. Once the inspection fees are paid we can set up a pre-con. Thanks, Michael Garza, P.E. Assistant Director of Engineering Engineering Department City of Coppell, TX www.coppelltx.gov 972-304-7019 (office) Please take our customer service survey 1 From: Jim Dewey Jr. [mailto:jdjr@jdjr.com] Sent: Tuesday, April 22, 2014 10:06 AM To: Michael Garza Cc: Debra Cox; Matthew Blaxton Subject: RE: Four Points Hotel Mike: The only substantial revision is the off-site storm drain. The adjacent owner would not agree to an easement, so we are having to go down the street. We understand we will have to remove and replace full panels. Jim Dewey, Jr. JDJR Engineers & Consultants, Inc. 2500 Texas Drive Suite 100 Irving, Texas 75062 Tel: 972-252-5357 Fax: 972-252-8958 From: Michael Garza [mailto:MGarza@coppelltx.gov] Sent: Monday, April 21, 2014 6:18 PM To: Jim Dewey Jr. Cc: Debra Cox; Matthew Blaxton Subject: RE: Four Points Hotel Jim, Ill look at them first thing in the morning, if there weren’t many changes from the last submittal months ago then they should be ready to go. We will need the permit attached filled out and inspection fees paid. Once these fees are paid we can then set up a pre-construction meeting, possibly for later this week or early next week. Thanks, Michael Garza, P.E. Assistant Director of Engineering Engineering Department City of Coppell, TX www.coppelltx.gov 972-304-7019 (office) Please take our customer service survey From: Jim Dewey Jr. [mailto:jdjr@jdjr.com] Sent: Monday, April 21, 2014 6:10 PM To: Michael Garza Cc: Debra Cox; Matthew Blaxton Subject: Four Points Hotel 2 Mike: Have you had a chance to review the revised civils? The contractor is anxious to start dirtwork, etc. Jim Dewey, Jr. JDJR Engineers & Consultants, Inc. 2500 Texas Drive Suite 100 Irving, Texas 75062 Tel: 972-252-5357 Fax: 972-252-8958 3