Duke Lesley 2RC-CS140423 Halie Hernandez From:Michael Garza Sent:Wednesday, April 23, 2014 7:31 AM To:Matthew Blaxton Cc:Debra Cox; Halie Hernandez; Jim Dewey Jr. Subject:Re: Four Points Hotel You can go ahead and install the erosion control only. Provide us a copy of the NOI/CSN. Thanks Michael Garza, P.E. Assistant Director of Engineering City of Coppell 972-304-7019 On Apr 22, 2014, at 9:32 PM, "Matthew Blaxton" <matt@d-c-solutions.com> wrote: Michael, Can I have permission to install SWPPP erosion control measure pre-permit and pre-con or do you require us to wait until following? I will work on getting permit and permit fee payment to you Wednesday. We are ready. Sincerely, Matthew D. Blaxton Design & Construction Solutions, LLC office (817) 886-3454 cell (817) 797-1463 <49EEAD1C-5BCC-4065-8903-5D830CB3884A[3].png> From: Michael Garza <mgarza@coppelltx.gov> Date: Tuesday, April 22, 2014 4:15 PM 1 To: Jim Dewey <jdjr@jdjr.com> Cc: Debra Cox <debrac@jdjr.com>, Matthew Blaxton <matt@d-c-solutions.com>, Halie Hernandez <HHernandez@coppelltx.gov> Subject: RE: Four Points Hotel Jim, The only comments I have are: 1) Where you change from hdpe to rcp you will need to connect via a junction box. 2) include a profile for the private sanitary sewer. 3) 2-2” domestic meters would be about $19,000 cheaper in impact fees than 1-4” meter. Please revise the plans and submit to us 3 sets for our use and however many the contractor will need for us to stamp for approval. Once the inspection fees are paid we can set up a pre-con. Thanks, Michael Garza, P.E. Assistant Director of Engineering Engineering Department City of Coppell, TX www.coppelltx.gov 972-304-7019 (office) <image001.png> <image002.png><image003.png> <image004.png> <image005.png> Please take our customer service survey From: Jim Dewey Jr. [mailto:jdjr@jdjr.com] Sent: Tuesday, April 22, 2014 10:06 AM To: Michael Garza Cc: Debra Cox; Matthew Blaxton Subject: RE: Four Points Hotel Mike: The only substantial revision is the off-site storm drain. The adjacent owner would not agree to an easement, so we are having to go down the street. We understand we will have to remove and replace full panels. Jim Dewey, Jr. JDJR Engineers & Consultants, Inc. 2500 Texas Drive Suite 100 Irving, Texas 75062 Tel: 972-252-5357 Fax: 972-252-8958 From: Michael Garza [mailto:MGarza@coppelltx.gov] Sent: Monday, April 21, 2014 6:18 PM To: Jim Dewey Jr. Cc: Debra Cox; Matthew Blaxton Subject: RE: Four Points Hotel 2 Jim, Ill look at them first thing in the morning, if there weren’t many changes from the last submittal months ago then they should be ready to go. We will need the permit attached filled out and inspection fees paid. Once these fees are paid we can then set up a pre-construction meeting, possibly for later this week or early next week. Thanks, Michael Garza, P.E. Assistant Director of Engineering Engineering Department City of Coppell, TX www.coppelltx.gov 972-304-7019 (office) <image001.png> <image002.png><image003.png> <image004.png> <image005.png> Please take our customer service survey From: Jim Dewey Jr. [mailto:jdjr@jdjr.com] Sent: Monday, April 21, 2014 6:10 PM To: Michael Garza Cc: Debra Cox; Matthew Blaxton Subject: Four Points Hotel Mike: Have you had a chance to review the revised civils? The contractor is anxious to start dirtwork, etc. Jim Dewey, Jr. JDJR Engineers & Consultants, Inc. 2500 Texas Drive Suite 100 Irving, Texas 75062 Tel: 972-252-5357 Fax: 972-252-8958 <image001.png> <image002.png> <image003.png> <image004.png> <image005.png> 3