I would like to eliminate all block around or under pipe .
Sent from my iPhone
On Apr 16, 2013, at 2:24 PM, Kyle Dykes <KDykes@tnpinc.com> wrote:
This approach sounds like what is detailed in the plans for all pipes 18” or larger. See sheet 8 of 9,
bottom left corner.
<image002.jpg>
Kyle Dykes, P.E., CFM
StormWaterGroup
1100 Macon Street
Fort Worth, Texas 76102
817.336.5773 Main
817.665.7171 Direct
kdykes@tnpinc.com
From: Steve Kenney [mailto:steve@jdkassoc.com]
Sent: Tuesday, April 16, 2013 2:09 PM
To: kmarvin@coppelltx.gov; Kyle Dykes; asamaniego@coppelltx.gov; marellano@coppelltx.gov; Tim May;
jelias@coppelltx.gov
Subject: Headwalls at RCP Extensions
Gentlemen,
After reviewing the plans I realized that we were going to cut blocks around the RCP pipes. (Very difficult
with a three piece system). My experience is when trying to cut block around RCP pipes it is not
aesthetically pleasing. At no cost to the city I am requesting that we be allowed to place 4 ft headwalls
around the pipes similar to the pre-existing and butt the retaining walls to each side.
Please respond to this request at your earliest convenience.
Thank you,
Thanks,
James (Steve). Kenney
President
JDK Associates, Inc.
940-686-6236
940-686-6318