Loading...
MA1009-CS130418 (3) Halie Hernandez From:Steve Kenney <steve@jdkassoc.com> Sent:Thursday, April 18, 2013 11:52 AM To:Kyle Dykes Cc:Keith Marvin; Alberto Samaniego; Tim May; John Elias; Michael Arellano Subject:RE: GeoWeb Gentleman, For the most part this will work but my concerns are if we move out the additional 2-4 feet we will be below the 446.50 water level. I am on my way out to the job and will verify grades and get back with you. Thanks, James (Steve). Kenney President JDK Associates, Inc. 940-686-6236 940-686-6318 From: Kyle Dykes [mailto:KDykes@TNPINC.com] Sent: Wednesday, April 17, 2013 3:52 PM To: Steve Kenney Cc: kmarvin@coppelltx.gov; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: RE: GeoWeb Steve, The attached sketch shows a revised typical section for the Geoweb installation. The existing ground is shown to scale for the area where we met onsite yesterday. The overall length of the 4:1 slope will vary slightly depending on the elevation of the trail. Let me know if you have any questions. Additional information will follow regarding:  Lake outfall elevation  Fishing Pier sleeves  Headwalls  Bridge decking Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com 1 From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Wednesday, April 17, 2013 3:15 PM To: Kyle Dykes Cc: kmarvin@coppelltx.gov; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: RE: GeoWeb Gentlemen, Do we have a solution yet? Thanks, James (Steve). Kenney President JDK Associates, Inc. 940-686-6236 940-686-6318 From: Kyle Dykes [mailto:KDykes@TNPINC.com] Sent: Tuesday, April 16, 2013 2:44 PM To: Steve Kenney Cc: kmarvin@coppelltx.gov; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: RE: GeoWeb I am working on a more thorough evaluation of this issue and will respond ASAP…no later than tomorrow. Kyle Dykes, P.E., CFM StormWaterGroup 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7171 Direct kdykes@tnpinc.com From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Tuesday, April 16, 2013 2:11 PM To: kmarvin@coppelltx.gov; Kyle Dykes; asamaniego@coppelltx.gov; Tim May; jelias@coppelltx.gov; marellano@coppelltx.gov Subject: GeoWeb Gentlemen, After our meeting today we took some grades around the edge of the lake to verify what the existing grades were at the edge of the water. We found that the existing ground is at the 445.50 one foot below water. If we are to move out an additional 5 feet, the geoweb will be anywhere from 2-2.5 below the 446.50 water level. It is my suggestion after meeting with the geoweb sales rep that we maintain the 7 to 1 for the first 8 feet, and the second 8 feet to 4-1 or whatever the existing conditions dictate. Please respond at your earliest convenience. 2 Thank you, Thanks, James (Steve). Kenney President JDK Associates, Inc. 940-686-6236 940-686-6318 3