Loading...
MA1009-CS130517 (3) Halie Hernandez From:Steve Kenney <steve@jdkassoc.com> Sent:Friday, May 17, 2013 1:00 PM To:Keith Marvin Subject:Re: Andy Brown - Toe Wall Detail (status update) Keith, When I was out today looking at the spill way and on the parking lot side the concrete is crack where they poured the concrete into the void. Can you take a look at it and advise on what we should do. Thanks Steve Sent from my iPhone On May 17, 2013, at 12:56 PM, Keith Marvin <KMarvin@coppelltx.gov> wrote: > FYI... > > Keith Marvin > City of Coppell > > Begin forwarded message: > > From: "Kyle Dykes" <KDykes@TNPINC.com<mailto:KDykes@TNPINC.com>> > To: "John Elias" <JElias@coppelltx.gov<mailto:JElias@coppelltx.gov>>, > "Keith Marvin" <KMarvin@coppelltx.gov<mailto:KMarvin@coppelltx.gov>> > Cc: "Alberto Samaniego" > <ASamaniego@coppelltx.gov<mailto:ASamaniego@coppelltx.gov>>, "Tim May" > <TMay@TNPINC.com<mailto:TMay@TNPINC.com>> > Subject: RE: Andy Brown - Toe Wall Detail (status update) > > Attached is the revised toe wall elevation and detail. Note: The > detail looks the same but the reinforcement and dimensions have been > revised. Let me know if you have any questions. Thanks > > [Description: M:\_Logos\TNP Logos\2012_ReBranding\_MASTER TNP > Logo_Color.jpg] > > Kyle Dykes, P.E., CFM > StormWaterGroup > 1100 Macon Street > Fort Worth, Texas 76102 > 817.336.5773 Main > 817.665.7171 Direct > kdykes@tnpinc.com<mailto:kdykes@tnpinc.com> > > From: John Elias [mailto:JElias@coppelltx.gov] > Sent: Thursday, May 16, 2013 9:05 AM 1 > To: Kyle Dykes; Keith Marvin > Cc: Alberto Samaniego; Tim May > Subject: RE: Andy Brown - Toe Wall Detail (status update) > > In case you we’re wondering, yes the lake is back to full capacity. We got 2” of rain last night. > > John > > From: Kyle Dykes [mailto:KDykes@TNPINC.com] > Sent: Thursday, May 16, 2013 9:01 AM > To: Keith Marvin; John Elias > Cc: Alberto Samaniego; Tim May > Subject: Andy Brown - Toe Wall Detail (status update) > > Gentlemen, > I have an elevation drawing of the spillway and have coordinated with > our structural team to get a revised detail drawn up today. I’m out > most of the afternoon but am hoping to send out the revised > information either late this morning, or sometime this evening. > Thanks > > [Description: M:\_Logos\TNP Logos\2012_ReBranding\_MASTER TNP > Logo_Color.jpg] > > Kyle Dykes, P.E., CFM > StormWaterGroup > 1100 Macon Street > Fort Worth, Texas 76102 > 817.336.5773 Main > 817.665.7171 Direct > kdykes@tnpinc.com<mailto:kdykes@tnpinc.com><mailto:kdykes@tnpinc.com> > > <image004.jpg> > <image001.jpg> > <07-MISC DETAILS_REV TOE WALL.pdf> 2