MA1009-CS130517 (3)
Halie Hernandez
From:Steve Kenney <steve@jdkassoc.com>
Sent:Friday, May 17, 2013 1:00 PM
To:Keith Marvin
Subject:Re: Andy Brown - Toe Wall Detail (status update)
Keith,
When I was out today looking at the spill way and on the parking lot side the concrete is crack where they poured the
concrete into the void. Can you take a look at it and advise on what we should do.
Thanks
Steve
Sent from my iPhone
On May 17, 2013, at 12:56 PM, Keith Marvin <KMarvin@coppelltx.gov> wrote:
> FYI...
>
> Keith Marvin
> City of Coppell
>
> Begin forwarded message:
>
> From: "Kyle Dykes" <KDykes@TNPINC.com<mailto:KDykes@TNPINC.com>>
> To: "John Elias" <JElias@coppelltx.gov<mailto:JElias@coppelltx.gov>>,
> "Keith Marvin" <KMarvin@coppelltx.gov<mailto:KMarvin@coppelltx.gov>>
> Cc: "Alberto Samaniego"
> <ASamaniego@coppelltx.gov<mailto:ASamaniego@coppelltx.gov>>, "Tim May"
> <TMay@TNPINC.com<mailto:TMay@TNPINC.com>>
> Subject: RE: Andy Brown - Toe Wall Detail (status update)
>
> Attached is the revised toe wall elevation and detail. Note: The
> detail looks the same but the reinforcement and dimensions have been
> revised. Let me know if you have any questions. Thanks
>
> [Description: M:\_Logos\TNP Logos\2012_ReBranding\_MASTER TNP
> Logo_Color.jpg]
>
> Kyle Dykes, P.E., CFM
> StormWaterGroup
> 1100 Macon Street
> Fort Worth, Texas 76102
> 817.336.5773 Main
> 817.665.7171 Direct
> kdykes@tnpinc.com<mailto:kdykes@tnpinc.com>
>
> From: John Elias [mailto:JElias@coppelltx.gov]
> Sent: Thursday, May 16, 2013 9:05 AM
1
> To: Kyle Dykes; Keith Marvin
> Cc: Alberto Samaniego; Tim May
> Subject: RE: Andy Brown - Toe Wall Detail (status update)
>
> In case you we’re wondering, yes the lake is back to full capacity. We got 2” of rain last night.
>
> John
>
> From: Kyle Dykes [mailto:KDykes@TNPINC.com]
> Sent: Thursday, May 16, 2013 9:01 AM
> To: Keith Marvin; John Elias
> Cc: Alberto Samaniego; Tim May
> Subject: Andy Brown - Toe Wall Detail (status update)
>
> Gentlemen,
> I have an elevation drawing of the spillway and have coordinated with
> our structural team to get a revised detail drawn up today. I’m out
> most of the afternoon but am hoping to send out the revised
> information either late this morning, or sometime this evening.
> Thanks
>
> [Description: M:\_Logos\TNP Logos\2012_ReBranding\_MASTER TNP
> Logo_Color.jpg]
>
> Kyle Dykes, P.E., CFM
> StormWaterGroup
> 1100 Macon Street
> Fort Worth, Texas 76102
> 817.336.5773 Main
> 817.665.7171 Direct
> kdykes@tnpinc.com<mailto:kdykes@tnpinc.com><mailto:kdykes@tnpinc.com>
>
> <image004.jpg>
> <image001.jpg>
> <07-MISC DETAILS_REV TOE WALL.pdf>