From:Michael Garza
Sent:Thursday, April 24, 2014 2:14 PM
To:Matthew Blaxton
Cc:James Fisher; Kevin Nelson; Mackie Klingbeil; Jim Dewey; Halie Hernandez; Kyra Cody
Subject:Re: Four Points Hotel
We are at 265 parkway.
Michael Garza, P.E.
Assistant Director of Engineering
City of Coppell
972-304-7019
On Apr 24, 2014, at 2:12 PM, "Matthew Blaxton" <matt@d-c-solutions.com> wrote:
Michael,
What address are you at? I have the permit check I need to bring to you so we can get the pre con
scheduled.
Sincerely,
Matthew D. Blaxton
Design & Construction Solutions, LLC
office (817) 886-3454
cell (817) 797-1463
<49EEAD1C-5BCC-4065-8903-5D830CB3884A[6].png>
From: Michael Garza <mgarza@coppelltx.gov>
Date: Tuesday, April 22, 2014 4:15 PM
To: Jim Dewey <jdjr@jdjr.com>
Cc: Debra Cox <debrac@jdjr.com>, Matthew Blaxton <matt@d-c-solutions.com>, Halie Hernandez
<HHernandez@coppelltx.gov>
Subject: RE: Four Points Hotel
1
Jim,
The only comments I have are: 1) Where you change from hdpe to rcp you will need to connect via a
junction box. 2) include a profile for the private sanitary sewer. 3) 2-2” domestic meters would be about
$19,000 cheaper in impact fees than 1-4” meter.
Please revise the plans and submit to us 3 sets for our use and however many the contractor will need
for us to stamp for approval. Once the inspection fees are paid we can set up a pre-con.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
Engineering Department
City of Coppell, TX
www.coppelltx.gov
972-304-7019 (office)
<image001.png>
<image002.png><image003.png> <image004.png> <image005.png>
Please take our customer service survey
From: Jim Dewey Jr. [mailto:jdjr@jdjr.com]
Sent: Tuesday, April 22, 2014 10:06 AM
To: Michael Garza
Cc: Debra Cox; Matthew Blaxton
Subject: RE: Four Points Hotel
Mike:
The only substantial revision is the off-site storm drain. The adjacent owner would not agree to an
easement, so we are having to go down the street. We understand we will have to remove and replace
full panels.
Jim Dewey, Jr.
JDJR Engineers & Consultants, Inc.
2500 Texas Drive Suite 100
Irving, Texas 75062
Tel: 972-252-5357
Fax: 972-252-8958
From: Michael Garza [mailto:MGarza@coppelltx.gov]
Sent: Monday, April 21, 2014 6:18 PM
To: Jim Dewey Jr.
Cc: Debra Cox; Matthew Blaxton
Subject: RE: Four Points Hotel
Jim,
Ill look at them first thing in the morning, if there weren’t many changes from the last submittal months
ago then they should be ready to go. We will need the permit attached filled out and inspection fees
2
paid. Once these fees are paid we can then set up a pre-construction meeting, possibly for later this
week or early next week.
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
Engineering Department
City of Coppell, TX
www.coppelltx.gov
972-304-7019 (office)
<image001.png>
<image002.png><image003.png> <image004.png> <image005.png>
Please take our customer service survey
From: Jim Dewey Jr. [mailto:jdjr@jdjr.com]
Sent: Monday, April 21, 2014 6:10 PM
To: Michael Garza
Cc: Debra Cox; Matthew Blaxton
Subject: Four Points Hotel
Mike:
Have you had a chance to review the revised civils? The contractor is anxious to start dirtwork, etc.
Jim Dewey, Jr.
JDJR Engineers & Consultants, Inc.
2500 Texas Drive Suite 100
Irving, Texas 75062
Tel: 972-252-5357
Fax: 972-252-8958