Loading...
ST9902-CS140404 (4) Halie Hernandez From:Chris Schmitt <cschmitt@tnpinc.com> Sent:Thursday, March 20, 2014 5:17 PM To:Keith Marvin Cc:George Marshall; Michael Garza; Robert Jenkins; Michael Wellbaum; Mike Jones Subject:RE: Sandy Lake Street Lights Works for us. Do you want to meet at main engineering office on Parkway? Chris Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com -----Original Message----- From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Thursday, March 20, 2014 2:01 PM To: Chris Schmitt Cc: George Marshall; Michael Garza; Robert Jenkins; Michael Wellbaum; Mike Jones; Casey McBroom Subject: Re: Sandy Lake Street Lights Chris, Would it be possible for us to meet on this lighting issue next Tuesday at 10:00am? Keith Marvin City of Coppell > On Mar 12, 2014, at 8:08 AM, "Chris Schmitt" <cschmitt@tnpinc.com> wrote: > > Keith, > 1 > Thanks for the heads up. I seem to recall discussing this previously but did not know where the City stood concerning direction. Let me know when you'd like to get together when you get back to town. Hopefully you are sitting on a beach somewhere enjoying Spring Break! > > Chris > > > > Chris Schmitt, P.E. > Principal > 17304 Preston Road, Suite 1340 > Dallas, Texas 75252 > 214.461.9867 Main > 903.421.1897 Mobile > 214.461.9864 Fax > cschmitt@tnpinc.com > > > > > > -----Original Message----- > From: Keith Marvin [mailto:KMarvin@coppelltx.gov] > Sent: Tuesday, March 11, 2014 7:25 PM > To: Chris Schmitt > Cc: George Marshall; Michael Garza > Subject: Sandy Lake Street Lights > > Chris, > > The City of Coppell is planning to change the approach to the street lights on the current stretch of Sandy Lake. We are planning to install city owned LED lights in the median. George Marshall is working on selecting a pole and luminaire style, but I wanted to give you a heads up that we will need to look at the layout based on a different type of light, and we will need to install meter bases and design the wiring components to power the lights. > > I'm out the rest of the week, but we will need to meet on this in the next week or two to make sure we have time to provide the necessary information to Tiseo to formulate a change order to the project. > > Thanks. > > Keith Marvin > City of Coppell > 2