Loading...
ST9902-CS131202 (4) Halie Hernandez From:Andrew Luce <ALuce@TNPINC.com> Sent:Monday, December 02, 2013 3:15 PM To:Keith Marvin Cc:Casey McBroom; Chris Schmitt Subject:FW: ST99-02B Sandy Lake Rd Pts Attachments:02Dec2013.prn Keith, Scott forwarded me some survey points at a conflict with the existing 24” water line and SD line ‘H’. It appears we can raise the storm drain over the water, while still being able to make the laterals work and not having to change any line sizes. Do you know if they have started on the junction box at STA 4+98? Raising the storm drain downstream would result in raising the junction box several feet. Please call or e-mail me to discuss further. Thanks, Andrew From: Scott Latta [mailto:SLatta@coppelltx.gov] Sent: Monday, December 02, 2013 12:56 PM To: Andrew Luce Subject: ST99-02B Sandy Lake Rd Pts Andrew, These are points taken on the top of the 24” wl, Lat H3, the 42” RCP and BM #3. I added an annotation column for clarity. Let me know if you need anything else. Thanks, Scott Latta Engineering Technician City of Coppell, Texas 265 Parkway Blvd. Coppell, Texas 75019 Office Phone: (972) 304-3683 Fax: (972) 304-3570 e-mailslatta@coppelltx.gov : “Building Community through Public Service” 1