ST9902-CS131202 (4)
Halie Hernandez
From:Andrew Luce <ALuce@TNPINC.com>
Sent:Monday, December 02, 2013 3:15 PM
To:Keith Marvin
Cc:Casey McBroom; Chris Schmitt
Subject:FW: ST99-02B Sandy Lake Rd Pts
Attachments:02Dec2013.prn
Keith,
Scott forwarded me some survey points at a conflict with the existing 24” water line and SD line ‘H’. It appears we can
raise the storm drain over the water, while still being able to make the laterals work and not having to change any line
sizes. Do you know if they have started on the junction box at STA 4+98? Raising the storm drain downstream would
result in raising the junction box several feet. Please call or e-mail me to discuss further.
Thanks,
Andrew
From: Scott Latta [mailto:SLatta@coppelltx.gov]
Sent: Monday, December 02, 2013 12:56 PM
To: Andrew Luce
Subject: ST99-02B Sandy Lake Rd Pts
Andrew,
These are points taken on the top of the 24” wl, Lat H3, the 42” RCP and BM #3. I
added an annotation column for clarity. Let me know if you need anything else.
Thanks,
Scott Latta
Engineering Technician
City of Coppell, Texas
265 Parkway Blvd.
Coppell, Texas 75019
Office Phone: (972) 304-3683
Fax: (972) 304-3570
e-mailslatta@coppelltx.gov
:
“Building Community through Public Service”
1