Loading...
ST9902-CS131004 (2) Halie Hernandez From:Delvin Black <dblack@tnpinc.com> Sent:Friday, October 04, 2013 8:32 AM To:Trent Widmer Cc:Keith Marvin; Casey McBroom Subject:RE: sandy lake rd questions Trent 1.Dimensions have been corrected. A revised sheet is being sent to Coppell including this and answers to items 2 & 3 2.Yes, the L bars are to be post-installed with epoxy adhesive. 3.This information has been added to Sheet 89 and would apply on the bridge deck also. Delvin Black, Ph.D., P.E. Senior Engineer - Structural 1100 Macon Street Fort Worth, Texas 76102 817.480.8968 Mobile 817.336.2813 Fax dblack@tnpinc.com From: Trent Widmer [mailto:twidmer@ibctx.com] Sent: Thursday, October 03, 2013 10:11 AM To: Delvin Black Cc: ckumnick@iowabridge.com; chanson@iowabridge.com; 'Romero, Carlos A' Subject: sandy lake rd questions Delvin, I have a couple questions coming from the plans. 1. Can you double check the dimensions in detail A, approach slab and abutment #1 on sheet 89. The numbers don’t all add up. 2. On sheet 89 it calls for an L bar to connect the sidewalk to the deck. Due to the phased construction we are unable to have that L bar sticking out of the deck. Because of the thickness of the slab and the panels we are left with a deck that is only poured 4.5" thick. This does not allow us enough space to use a threaded coupling system. Do you have any ideas as to a method that will work in this application. Could we epoxy a dowel bar after the deck is poured? 3. Is a detail needed for how the interior rail at the bike trail connects to the sidewalk. I think it will be similar to the detail on sheet 86 but the sidewalk will be thinner. Please clirify. Thanks, 1 Trent Widmer Superintendent Iowa Bridge & Culvert, LC 9100 Hwy 380 Cross Roads, TX 76227 214.347.1219 M 940.440.0099 O 940.440.0079 F 143*100509*5 Nextel twidmer@ibctx.com The information in this message may be priviledged, confidential, and protected from disclosure. If you are not the intended recipient, employee, or agent responsible for delivery to intended recipient, any dissemination is strictly prohibited. If you have recieved this communication in error, please notify sender immediatley. Opinions, conclusions and other information in this message, unless otherwise stated, that do not relate to Iowa Bridge & Culvert, LC (IBC) official business, are those of the sender and are neither given or endorsed by IBC. 2