Loading...
Park West CrossingDEVFEE DEVELOPMENT FEES PROJECT NAME: Park West Crossing ENGINEER: ORIGINATION DATE:4/28/2014 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection$40,049.34$40,049.34hlh4/28/2014 EG or Bore Permit Overtime Inspection Water Tap Inspection$100.00 Wastewater Tap Inspection$50.00 Water Meter (Domestic)$334.95 Water Meter (Fire/Irrig)$224.70 Meter Deposit (Domestic)$30.00 Meter Deposit (Fire/Irrig)$30.00 Utility Final Inspection$50.00 Subtotal to Eng.$40,049.34$40,049.34$0.00 Total FeesFees PaidAmount Owed TOTALS$2,045.10 $40,868.99$38,823.89 (credit) NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint.