Park West CrossingDEVFEE
DEVELOPMENT FEES
PROJECT NAME: Park West Crossing
ENGINEER:
ORIGINATION DATE:4/28/2014
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee
Wastewater Impact Fee
Park Fee
Roadway Impact-Zone
Street Sign
Street Light
Construction Inspection$40,049.34$40,049.34hlh4/28/2014
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$100.00
Wastewater Tap Inspection$50.00
Water Meter (Domestic)$334.95
Water Meter (Fire/Irrig)$224.70
Meter Deposit (Domestic)$30.00
Meter Deposit (Fire/Irrig)$30.00
Utility Final Inspection$50.00
Subtotal to Eng.$40,049.34$40,049.34$0.00
Total FeesFees PaidAmount Owed
TOTALS$2,045.10
$40,868.99$38,823.89
(credit)
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.