Loading...
2012_1024CHECK ONE: IRRIGATION_ DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS PWS I.D. # C-b-PPE LL LOCATION OF SERVICE: !r iY 7 S F+ { -2- j The backflow prevention assembly detailed below has been tested and maintained as required by TCEQ regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY ❑ Reduced Pressure Principle ❑ Pressure Vacuum Breaker C Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturer FE E3 CC-) size Model Number `J 0 Serial Number h" 3 -1 R g L it Located At T—^' �5/ w CvrUrt� -- OF }�2C�PU2'' / The above is certified to be true. Firm Name 4 f Iq Ae- i Ty r, AeAFt�`Certified Tester � Firm Address (-fi )e- L bi�c iaa �--! '/)C-- 75crr'7 Cert. Tester No. W b b 133 1) w Date >D -- Z g -/ Z Gauge # yng0 - f � Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Closed Tight Opened at Opened at osid -Pa S5 Tight ❑ RP- .Z sid Leaked ❑ Leaked C3 Z I `� psid osid Did not Open ❑ Leaked ❑ Repairs and Materials Used Test After DC- Closed Closed Tight ❑ Opened at Opened at osid Repair Tight ❑ psid osid RP sid The above is certified to be true. Firm Name 4 f Iq Ae- i Ty r, AeAFt�`Certified Tester � Firm Address (-fi )e- L bi�c iaa �--! '/)C-- 75crr'7 Cert. Tester No. W b b 133 1) w Date >D -- Z g -/ Z Gauge # yng0 - f � Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy