Loading...
2012_0724 (3)CHECK ONE: IRRIGATION DOMESTIC FIRELINE___�,/ BA OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PPS I.D. 9 LOCATION OF SERVICE:, bli Lao_ The backilow Prevention assembly detailed below has been tested and maintained as required by TCEQ reutilations and is certified to he operating within acceptable parameters. t2 ME OF ASSEMBLY 0 Reduced Pressure Princile C Pressure Vacuum Breaker 0 Double Check Valve 0 Atmosphere Vacuum Breaker Manufactures 1.6- e- (9 Size B fl Model Number 8540 Located At AJc*��q,kLc. 14 Serial Number k1A-T LFjQlbL8' I."; REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM B-R—EA—K-ER Double Check Valve Assembly Relief Valve Air Inlet Check Valve 1st Check- 2nd Check- Initial Test DC-Closed 2 c Closed Tight Opened at Opened at osid Tight Leaked ❑ psid nsid RP------psid Leaked C Did not Open ❑ Leaked ❑ Repairs and Materials Used Test After DC-Closed Closed Tight C3 Opened at Opened at nsid Repair Tight Psid sid RP======2sid The above is certified to be true. Firm Name Ac4 ov, f7l!:te &C CerdfiedTe= -, JaSOv .L _ Firm Address 1% 62,V :Z q] --- Cart. Tester No. OffiQlQE22 Date 2�2--42 W c� >c t' k A- C- V(v -rx Gauge # I / Date last accuracy tested White - Customer's Copy Yellow - City Copy Pink - Tester's Copy