Loading...
2012_0724 (6)CHECK ONE IRRIGATION---- DOMESTIC FIRELINE x BA=OW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. 9 LOCATION OF SERVICE: e c o The backl1mv prevention assembly detailed beloxv has been tested and maintained as required by TCEQ regulations and is certified to be operatint., within acceptable parameters. TYPE OF ASSEMBLY 0 Reduced Pressure Principle 0 Pressure Vacuum Breaker Double Check- Valve 0 Atmosphere Vacuum Breaker Manufacturer fa- 0 size Model Number s Located At u6 Serial Number 070 2 2 Le I REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly Ist Check L2nd Check Relief Valve Air Inlet Check Valve Initial Test DC-Closed Closed Tight X Opened at Opened at nsid Tight Leaked 13 psid sid RP----.psid 5, Leaked C Did not Open 0 Leaked 13 Repairs and Materials Used I Test After DC-Closed Closed Tight C] Opened at Opened at sid Repair Tight a nsid psid R-P=====2std The above is certified to be true. Firm Name ZzLla Lta E -Plfa) Certified Tester Lsm),J Firm Ad&dedZ --� '-7 Cent. Tester No. Date 7/e- 2 ujc',,/w a-, V� Gauge # -&l L Q O 75 Date la q 11 last accuracy tested 5 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy