Loading...
2012_0601 (4)BACMOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPF.LL PWS I.D. # LOCATION OF SERVICE: G The baclflow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacuum Breaker Double Check Valve c Atmosphere Vacuum Breaker Manufacturer / 7�T s Size Model Number 7 / Located At %el Serial Number 3� �' l3 / A m "S A- G The above is certified to be true. �� �i / Firm Name ACIA9 Al // P Certified Tester 1'111 // e zz11 11- S Firm Address ��! �� 1/ 7 Cat. Testa No. �,��Od Date Gauge # Oi!� e ylll' Date last accuracy tested y �` 2 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy PRESSURE VACUUM BREAKER REDUCED PRESSURE PRINCIPLE ASSEMBLY Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed Tight ,.W- Closed Tight `,Ri Leaked r �% C Opened at nSid Opened at -pSid osid RP- ,_„psid Leaked o Did not Open o Leafed C Reps and Materials Used Test After DC- Closed Closed Tight o Opened at Opened at _nsid Repair Tight C osid nsid RP std The above is certified to be true. �� �i / Firm Name ACIA9 Al // P Certified Tester 1'111 // e zz11 11- S Firm Address ��! �� 1/ 7 Cat. Testa No. �,��Od Date Gauge # Oi!� e ylll' Date last accuracy tested y �` 2 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy