Loading...
2012_0601 (6)CHECK ONE: IRRIGATION DOMESTIC FIRELINE_V_ BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: 6 C�) 5 we l/ 4 1 The backilow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. ❑ Reduced Pressure Principle Double Check Valve Manufacturer t&,4 � T S Model Number 6 & v Af / - Serial Number --,? V 7 q �, TYPE OF ASSEMBLY • Pressure Vacuum Breaker • Atmosphere Vacuum Breaker size �' �- Located At e (I A I, f The above is certified to be true. Firm Name /" / / t' Certified Tester ✓�< ° i %�� rJ. � .s Firm Address i=� �j `' y 7 " ""Ceri. Testa No. !J I�LJ t) C'o ` Dar Gauge # 0 6 G' Y/ % T.GJ Date last accuracy tested -/ /,Z -1A White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check Relief Valve Air Inlet Check Valve Initial Test DC- Closed , Tight /- 4, bC Closed Tight Y Leaked /. 'L/ ❑ Opened at oSid Opened at oSid osid RP -_psid Leaked ❑ Did not Open o Leaked ❑ Repairs and Materials Used Test After Repair DC- Closed Tight ❑ Closed Tight o Opened at oSid Opened at oSid n sid RP Sid The above is certified to be true. Firm Name /" / / t' Certified Tester ✓�< ° i %�� rJ. � .s Firm Address i=� �j `' y 7 " ""Ceri. Testa No. !J I�LJ t) C'o ` Dar Gauge # 0 6 G' Y/ % T.GJ Date last accuracy tested -/ /,Z -1A White - Customer's Copy Yellow - City Copy Pink - Tester's Copy