Loading...
2012_0629 (3)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKYLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: 8,20 We-',A -SrMV (Q °k La d The bad -now prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY e Reduced Pressure Principle a Pressure Vacuum Breaker Double Check Valve C Atmosphere Vacuum Breaker Manufacturer rp kc Size Model Number HC5 .y �) Located At ,ire. -A k I Serial Number (a:�56Q 'J The above is certified to be true. Firm Name. 1 I C re n nj Se ( u r i -A/ Certified Tester I a c) re-1 i Firm Address (l CC-tn LAY) Cert. Taster No. APC' /'/6, 4 -3Date )q- I Z Fcr) TX 7fk I1 Q Gauge # [ �} 3�� a �► Date last accuracy tested (D --, -; s 1 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly _ 1 Z Relief Valve Air Inlet Check Valve 1st Check 1 2nd Check I . Initial Test DC- Closed Tight Closed Tight Leaked ❑ Opened at vsid Opened at nsid nsid PASS R.P -_psid Leaked ❑ Did not Open ❑ Leaked ❑ Reps and Materials Used Test After Repair DC- Closed Tight ❑ Closed not a Opened at nsid Opened at nsid nsid RP sid The above is certified to be true. Firm Name. 1 I C re n nj Se ( u r i -A/ Certified Tester I a c) re-1 i Firm Address (l CC-tn LAY) Cert. Taster No. APC' /'/6, 4 -3Date )q- I Z Fcr) TX 7fk I1 Q Gauge # [ �} 3�� a �► Date last accuracy tested (D --, -; s 1 White - Customer's Copy Yellow - City Copy Pink - Tester's Copy