Loading...
2012_0629 (4)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: PWS I.D. # CITY OF COPPELL LOCATION OF SERVICE: (,I C,,� 5r The back-Dow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. TYPE OF ASSEMBLY C Reduced Pressure Principle C Pressure Vacuum Breaker x ) Double Check Valve ❑ Atmosphere Vacuum Breaker Manufacturer ,C Size , Model Number` Located At Serial Number C0 5 C 2,,J= JJ- The above is certified to be true. Firm Name !J(rA I F1 Ce QAA L-01 U r i Firm Address( 9 Nrn2, &i.,i i1 Fer h- %,sTX`76. 1 Jc,, Gauge # Date last accuracy tested (D- ,;),5 - J 2- Certified Tester Tr .6 u S CC r -%A re.11 Cert. Tester No. (WW, I y (o y -3 Date Cc 1 -) Z. White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly Relief valve Air Inlet Check Valve 1st Check ,.),L 2nd Cheri: j , ' Initial Test DC- Closed Tight Closed Tight Leaked ❑ Opened at vsid Opened at nsid nsid RP- _,.psid Leai;e ❑ Did not Open ❑ Leaked o Repairs and Materials Used Test After Repair DC- Closed Tight ❑ Closed not ❑ Opened at nsid Opened at osid � sid RP sid The above is certified to be true. Firm Name !J(rA I F1 Ce QAA L-01 U r i Firm Address( 9 Nrn2, &i.,i i1 Fer h- %,sTX`76. 1 Jc,, Gauge # Date last accuracy tested (D- ,;),5 - J 2- Certified Tester Tr .6 u S CC r -%A re.11 Cert. Tester No. (WW, I y (o y -3 Date Cc 1 -) Z. White - Customer's Copy Yellow - City Copy Pink - Tester's Copy