Loading...
2012_0629 (6)CHECK ONE: IRRIGATION DOMESTIC FIRELINE BACKFLOW PREVENTION ASSEMBLY TEST AND MAINTENANCE REPORT NAME OF PWS: CITY OF COPPEL'Lr, PWS I.D. # LOCATION OF SERVICE: e cAQ (ScW— i'i The back-flow prevention assembly detailed below has been tested and maintained as required by TNRCC regulations and is certified to be operating within acceptable parameters. Reduced Pressure Principle Double Check Valve JC y � Manufacturer o Model Number WZ Serial Number -Zn1,(0 TYPE OF ASSEMBLY e Pressure Vacuum Breaker C Atmosphere Vacuum Breaker Size �f'f Located At 41 AA4 IC Q&& '7_ I' up 42CA, 1- 0w2t-V- The above is certified to be true. Firm Na=1Z4rW Firm Address���i_' IC�(ic�C Gauge # 09630 9-3 ct Date last accuracy tested 3 - ?a- Q Certified Testa 6ywn Vf"I k Cat. Testa No. �� I N' q Date White - Customer's Copy Yellow - City Copy Pink - Tester's Copy REDUCED PRESSURE PRINCIPLE ASSEMBLY PRESSURE VACUUM BREAKER Double Check Valve Assembly 1st Check 2nd Check E&jValve Air Inlet Check Valve Initial Test DC- Closed Tight RP- 1- Dsid Leaked p e6losed Tight el Leaked -� o Opened at nSid Opened at nSid Did not Open o nsid Leaked Reps and Materials Used Test After Repair DC- Closed Tight C Closed Tight o Opened at DSid Opened at _pSid _ nsid RP sid The above is certified to be true. Firm Na=1Z4rW Firm Address���i_' IC�(ic�C Gauge # 09630 9-3 ct Date last accuracy tested 3 - ?a- Q Certified Testa 6ywn Vf"I k Cat. Testa No. �� I N' q Date White - Customer's Copy Yellow - City Copy Pink - Tester's Copy